00197783-01_AI_Gantry-Retrofit_X-Series_S_INTERNAL_de_en.pdf - 第99页
Brief Description 2.4.1 Overview of Parts Tools and Equipment Required Gantry Retrofit Portalnachrüstung 99 2.5 2 . 5 T o o ls a n d E q u ip m e n t R e q u ir e d Tools and Equipment Required ▪ Standard tools ▪ Hose pl…

Brief Description
Scope of Delivery 2.4.1 Overview of Parts
98 Gantry Retrofit Portalnachrüstung
GCU
Y trailing cable for gantry 1/3 incl. assembly material
Y trailing cable for gantry 2/4 incl. assembly material

Brief Description
2.4.1 Overview of Parts Tools and Equipment Required
Gantry Retrofit Portalnachrüstung 99
2.5
2.5 Tools and Equipment Required
Tools and Equipment Required
▪ Standard tools
▪ Hose pliers
▪ Torque wrench (2 – 25 Nm) [00376625-xx] (for the trolley bearings)
▪ Depth measuring gauge 300 mm [03079617-xx]
▪ Loctite 241 [02101037-xx]
▪ Second person
The assistance of a second person is helpful for many tasks and even essential for some.
▪ Service manual HF/X-Series (internal version) [00195654-xx]
▪ Service manual for your machine [DE: 00197041-xx] [EN: 00197042-xx]
▪ When vacuum pump is installed:
Assembly instructions "Vacuum Pump SIPLACE X-Series S, SX4/DX4" [00196845-xx]
2.6
2.6 Required Working Time
Required Working Time
The complete installation will take approx. 8 hours with two people.
The new installation of the machine software, with calibration and gantry mapping, takes approx. 4
hours.
Gantry
Brief Description
Required Working Time 2.4.1 Overview of Parts
100 Gantry Retrofit Portalnachrüstung