EN 3.pdf - 第190页

Model DECAN Series Company SAMSUNG TECHWIN Module 3.1 1 HEAD V ersion 01 Tit le HEAD SOLENOID V A L VE REPLACEMENT (L2) Page 3-1 1-30 Note [HEAD SOLENOID V AL VE REPLACEMENT (L2)]  Separate the Air Module. Separate the …

100%1 / 355
Model
DECAN Series
Company
SAMSUNG TECHWIN
Module
3.11 HEAD
Version
01
Title
HEAD SOLENOID VA LVE REPLACEMENT (F2)
Page
3-11-29
Note
Air Module assembly
1. Assemble the following in the order: Elbow Fitting, Straight Fitting, Filter.
2. Insert the O-ring and fix the Vacuum Sensor Board with Screws.(3Kgf.cm)
3. Assemble the Plug Fitting and the Elbow Fitting.
4. Fix the Blow Valve with Screws.(10Kgf.cm)
5. Fix the Manifold Plate1 and 2 with Screws.(7Kgf.cm)
6. Fix the Manifold Plate1/2 into the Air Module Assy with Screws.(10Kgf.cm)
Connect the air pressure tube.
Model
DECAN Series
Company
SAMSUNG TECHWIN
Module
3.11 HEAD
Version
01
Title
HEAD SOLENOID VA LVE REPLACEMENT (L2)
Page
3-11-30
Note
[HEAD SOLENOID VALVE REPLACEMENT (L2)]
Separate the Air Module.
Separate the Air Tube from the Air Module Assy and then separate the Air Module Assy by releasing the
fixing bolts.
Disassemble the Air Module.
Model
DECAN Series
Company
SAMSUNG TECHWIN
Module
3.11 HEAD
Version
01
Title
HEAD SOLENOID VA LVE REPLACEMENT (L2)
Page
3-11-31
Note
Connect the air pressure tube.
Classificat
ion
1 2 3 4 5 6 7 8
Tube color
s
Blue Black Black Black Black Black Black Yellow
Length(m
m)
510 470 440 410 380 350 320 30
*At the tip of the number 8 yellow tube with length of 30mm, connect the straight fitting and connect the
300mm yellow tube.