1OM-1626-001_w.pdf - 第145页

1OM-1610 3-26 4. Stop, Interruption, and Restart of Operation : Chap.3 4.2.2 Interruption with [EMERGENCY ST OP] Switch To stop the machine immediately in an emergency, press the [EMERGENCY STOP] switch. [EMERGENCY ST OP…

100%1 / 227
1OM-1610
3-25
4. Stop, Interruption, and Restart of Operation : Chap.3
4.2 Interruption of Automatic Operation
4.2.1 Interruption with [Cancel] Button
When it was found that a wrong pattern program is specied as the current one
(production model) and the production must be interrupted, follow the steps below
to interrupt the automatic operation.
Procedure
(1) Press the [STOP] button on the operation panel.
The automatic operation stops temporarily.
(2) Press the [Operation] button on the submenu bar of the "Operation" window.
The "OPERATION" window appears.
F1C22
(3) Press the [Cancel] button.
The automatic operation is interrupted.
Note
To continue the automatic operation from this interrupted mode, refer to "4.3
Resumption of Production through Warm Start Procedure" for details.
Notice
When a normal restart operation is performed after the continuous
operation has become impossible during component placement, the PCB
in the middle of process is discharged to the output machine, producing
a defective PCB.
Be sure to perform the reset operations through the "WARM START"
procedure.
0911-001
1OM-1610
3-26
4. Stop, Interruption, and Restart of Operation : Chap.3
4.2.2 Interruption with [EMERGENCY STOP] Switch
To stop the machine immediately in an emergency, press the [EMERGENCY
STOP] switch.
[EMERGENCY STOP] Switches
F1C23
An alarm is issued and the [POWER ON] button illuminates in red.
0911-001
1OM-1610
3-27
4. Stop, Interruption, and Restart of Operation : Chap.3
4.3 Resumption of Production through Warm Start Procedure
Through the warm start procedure, the machine can be started to resume the
production from the step in which the machine has stopped, that is, no defective
PCB will be produced.
Notice
When the warm start sequence is interrupted, some components may
not be placed on the PCB currently in the course of the production. It is
advisable that the production should be started through the warm start
procedure.
Procedure
(1) Press the [Last Component Placement Position Move/Check] button.
F1C24
F1C25
0911-001