1OM-1626-001_w.pdf - 第157页
1OM-1610 091 1-001 4-B

1OM-1610
0911-001 4-A
Chapter 4
Program Change Operation
In this chapter, the pattern program change procedure is described.
1. Outline of Program Change Operation
2. Preparation for Program Change Operation
3. Program Change Operation
4. ConrmationofPlacement

1OM-1610
0911-001 4-B

1OM-1610
4-1
1. Outline of Program Change Operation : Chap.4
0911-001
1. Outline of Program Change Operation
Follow the steps below to perform a program change operation.
Preparation for Program
Change Operation
Program Change
Operation
Confirmation of Placement
2.1 Preparation for Component Library
2.2 Creation of Pattern Program for Production Model
2.3 Registration of Pattern Program for Production Model
2.4 Preparation for Feeders
3.1 Selection of Run Mode
3.2 Selection of Operation Mode
3.3 Setups for PCB Support Pins and Conveyor Width
3.3.1 Collection of PCB Support Pins and Setup
Operation of Conveyor Width
3.3.2 Attachment of PCB Support Pins
3.3.3 Notes on Attachment / Detachment of
PCB Support Pins
3.4 Preparation for Vacuum Nozzles
3.5 Confirmation of PCB Transfer and Positioning
4.1 Setting of Operation Mode
4.2 Confirmation of Component Placement
Flow of Program Change Operation for Production Model
F1D1