MAN00000772_SI-G200BB_SVCPDFA.pdf - 第144页

  O perati onGuide W o rkPr ocess PartsReplacem ent M ai nt enance I n te nd e d i t em S I -G200 AA  BB Docume n t no.W KGB- 2010 5 -0 1 Page  2/8  [Required eq uip me…

100%1 / 712
OperationGuide WorkProcess PartsReplacement Maintenance
Intendeditem SI-G200AABB
Documentno.WKGB-20105-01
Page 1/8
SI-G200 AA BB SH terminals separation to prevent ground relay
Take off SH terminal from machine frame and covers to insulate with plastic tape. After insulation fix
SH lines to prevent interfering during production.
CONTENTS
[Required equipments]...............................................................................................................................2
1. Before work...........................................................................................................................................2
2. Taking off SH terminals of feed cover ................................................................................................ 4
3. Taking off SH terminals of X-Y relay .................................................................................................5
4. Taking off SH terminals of upper frame ............................................................................................7
5. Return back original condition............................................................................................................8
Before After
OperationGuide WorkProcess PartsReplacement Maintenance
Intendeditem SI-G200AABB
Documentno.WKGB-20105-01
Page 2/8
[Requiredequipments]
Hexagon wrench
Nipper
Nylon tie (AB 150, AB 100)
Screw driver (Plus)
Screw driver plus, with short length (See photo.)
Plastic tape
Screw driver plus, with short length
1. Beforework
Power off machine.
Loosen 2 CP 4 x 45 from machine inside shown as photo, to take
off top plate which is on machine both sides.
Poweroffswitch
Mainbreaker
OperationGuide WorkProcess PartsReplacement Maintenance
Intendeditem SI-G200AABB
Documentno.WKGB-20105-01
Page 3/8
Loosen 8 CP 3 x 6 to take off head connector cover of front side.
Take off head connector cover of rear side as same way.
Loosen 4 CP 4 x 15 to move tower light position from side
sealing to machine top center. It is not requires to take off the
connector which connects tower light and machine.
Loosen 2 CP4 x 8 to shift side sealing position by 10 mm to machine outside.
Now preparation is completed.