MAN00000772_SI-G200BB_SVCPDFA.pdf - 第145页

  O perati onGuide W o rkPr ocess PartsReplacem ent M ai nt enance I n te nd e d i t em S I -G200 AA  BB Docume n t no.W KGB- 2010 5 -0 1 Page  3/8  Loosen 8 C P 3 x 6 t …

100%1 / 712
OperationGuide WorkProcess PartsReplacement Maintenance
Intendeditem SI-G200AABB
Documentno.WKGB-20105-01
Page 2/8
[Requiredequipments]
Hexagon wrench
Nipper
Nylon tie (AB 150, AB 100)
Screw driver (Plus)
Screw driver plus, with short length (See photo.)
Plastic tape
Screw driver plus, with short length
1. Beforework
Power off machine.
Loosen 2 CP 4 x 45 from machine inside shown as photo, to take
off top plate which is on machine both sides.
Poweroffswitch
Mainbreaker
OperationGuide WorkProcess PartsReplacement Maintenance
Intendeditem SI-G200AABB
Documentno.WKGB-20105-01
Page 3/8
Loosen 8 CP 3 x 6 to take off head connector cover of front side.
Take off head connector cover of rear side as same way.
Loosen 4 CP 4 x 15 to move tower light position from side
sealing to machine top center. It is not requires to take off the
connector which connects tower light and machine.
Loosen 2 CP4 x 8 to shift side sealing position by 10 mm to machine outside.
Now preparation is completed.
OperationGuide WorkProcess PartsReplacement Maintenance
Intendeditem SI-G200AABB
Documentno.WKGB-20105-01
Page 4/8
2. TakingoffSHterminalsoffeedcover
Loosen 2 P4 x 6 to take off SH terminal on feed cover. After taking off SH terminals fix 2 P4 x 6
and tooth lock washers.
Wrap SH Terminal with plastic tape to fix nylon tie
This process should be done for front and rear side.
Work spot
Enlarged
Enlarged (completed)