MAN00000772_SI-G200BB_SVCPDFA.pdf - 第648页
RPGB-10101-01 F A xis Belt Replacement Procedure [Adjustment] Conduct setup. For setup pr oced ur e, refer to HLGB-10206 “F axis setup”.

RPGB-10101-01
F Axis Belt Replacement Procedure
Install the tension JIG.
Pull the motor bracket after fastening
C3x12 screws to adjust tension.
~
:
:
:
Fasten 2-C4x10 with no gap between
the motor bracket and the main frame.

RPGB-10101-01
F Axis Belt Replacement Procedure
[Adjustment]
Conduct setup.
For setup procedure, refer to HLGB-10206 “F axis setup”.

RPGB-10201-01
Pickup Check Camera Up/Down
Cylinder Replacement
[Removing the Cylinder]
For the F-axis unit removal procedure, refer to “F-Axis Belt Replacement Procedure [RPGB-10101-01]”.
Disconnect connector CAM2-UF
(CAM2-UR) on the camera cable.
Loosen 2-CP4x8 to remove the pickup
check camera.
Remove the cable tie (Insulock) from SSB-2 and
SSB-4 cables as well.