MAN00000772_SI-G200BB_SVCPDFA.pdf - 第151页
2 Consol e Operation Procedure

OperationGuide WorkProcess PartsReplacement Maintenance
Intendeditem SI-G200AABB
Documentno.WKGB-20105-01
Page 8/8
Enlarged (Completed)
5. Returnbackoriginalcondition
Put back side sealing parts to fix with CP 4 x 8.
Put back tower light position to fix with 4 CP 4 x 15.
Put back top plates to fix with CP 4 x 45.
Put back connector covers to fix with 8 CP 3 x 6.

2 Console Operation
Procedure
