2-76 2 Operation 4. [Analyze] button Able to analyze the production feasibility based on the selected job order and the stock in the mac hine. 5. Analysis option T he settings to analyze job orders, such as Alias, OEM, a…

2-75
2
Operation
3. [Menu] button
Able to go to each function.
Menu list
24291-KMS-00
Select all
Able to select all the job orders in the list. All the check boxes at left end of job orders
are ticked.
Add Create a job order additionally.
Edit Edit a registered job order.
Import Create a job order by importing the file.
Print list All job orders to be analyzed here are listed.
Print analysis list
The job orders to be analyzed here and all items to be used are listed after production
analysis.
Print missing items
The job orders to be analyzed here and all items which are not enough quantities are
listed after production analysis.
n
Print list
Select the job orders, and select "Print list" in Menu. Then, job orders are listed in "Print Preview" screen.
Press [Save] button to save the list in pdf format, press [Export] button to save the list in XML format.
If the machine is connected to a printer through an external network, pressing [Print] button prints the list.
"Print analysis list" and "Print missing list" are checked after production analysis. See "3.7.4 Analyze in PLANNNER" for
details.
“PRINT PREVIEW” screen
[Export] button [Save] button
[Print] button
24292-KMS-00

2-76
2
Operation
4. [Analyze] button
Able to analyze the production feasibility based on the selected job order and the stock in the machine.
5. Analysis option
The settings to analyze job orders, such as Alias, OEM, and so on.See "3.7.4 Analyze in PLANNNER" for details.
6. Shared extraction
It is displayed after production analysis.If there are some packagings, which are common in multiple job orders, in the
selected job order, their quantity and ratio of the packagings are displayed.
7. [Detail] button
Able to use this button if production analysis fails.If there are no enough quantities of some packagings in YST15, it is
possible to make settings of Alias or OEM.
8. [Process] button
Able to move the selected job orders to "JOB ORDERS" screen.

2-77
2
Operation
3.7.2 Create a job order in PLANNER
Creating a job order in PLANNER is described.Step 3 and later are same as "3.6.2 Create a job order manually"
1
Open "PLANNNER" screen.
2
The job order creating screen appears.
3
The following procedure is same as "3.6.2 Create a job order manually".
Input necessary contents.
"PLANNER" screen
“Add”
[Menu] button
24293-KMS-00
Job order creating screen
24294-KMS-00