YSi-SP_Ope_E.pdf - 第4页

3.4 Measurement 2-24 3.4.1 Profile Screen 2-26 3.4.2 Wide Area Measurement Screen 2-28 3.4.3 NG PCB list 2-29 3.4.4 Alloc Disp 2-29 3.4.5 Pad info 2-30 3.4.6 PCB W arping Measuring Function 2-30 3.5 Manual Operation 2-35…

100%1 / 147
5. Temporary measure for PLC/UPS failure 1-10
5.1 Pass Mode of PLC 1-10
5.1.1 PLC switch panel 1-10
5.1.2 Adjustment of the conveyor width 1-11
5.1.3 Explanation of switches 1-11
5.1.4 Operational procedure of forced PASS mode 1-11
5.2 Disabling UPS 1-12
6. Maintenance 1-13
6.1 Daily inspection 1-13
6.1.1 Daily general inspection 1-13
6.1.2 Monthly inspection items and details of the inspection 1-13
6.2 Grease lubrication 1-14
6.3 Part replacement and adjustment 1-16
6.3.1 Replacement of the conveyor pulley 1-16
6.3.2 Replacement of the conveyor belt 1-18
6.4 Troubleshooting 1-19
Chapter 2 Operation
1. Configuration 2-1
1.1 Overall View 2-1
1.2 System configuration 2-2
1.3 Tower Light Display 2-3
1.4 Emergency Stop 2-3
2. Operation Procedure 2-4
2.1 Flow of Inspection 2-4
2.2 Operation of One Cycle 2-5
2.3 Starting the Inspection Machine 2-6
2.4 PCB Change 2-7
2.5 PCB Transfer 2-9
2.5.1 Loading the PCB 2-9
2.5.2 Unloading the PCB 2-9
2.6 Inspection 2-10
2.6.1 Standalone Inspection 2-11
2.6.2 Automatic Inspection 2-15
2.6.3 Pass Mode 2-16
2.7 Shutdown of Inspection Machine 2-17
3. Screen Configuration and Each Function 2-18
3.1 Screen Configuration 2-18
3.2 Inspection 2-19
3.3 PCB Change 2-22
3.4 Measurement 2-24
3.4.1 Profile Screen 2-26
3.4.2 Wide Area Measurement Screen 2-28
3.4.3 NG PCB list 2-29
3.4.4 Alloc Disp 2-29
3.4.5 Pad info 2-30
3.4.6 PCB Warping Measuring Function 2-30
3.5 Manual Operation 2-35
3.6 Function/Setting 2-37
3.6.1 I/O Data Display Screen 2-39
3.6.2 Image Save Setting 2-39
3.6.3 User Authentication 2-40
3.6.4 Tower Light Setting 2-43
3.6.5 Chart Setting 2-44
3.6.6 Print Gap Setting 2-44
3.6.7 M/C operation setting 2-46
3.6.8 Fiducial mark manual adjust 2-46
3.6.9 User authority setting 2-49
3.6.10 Pad NG info 2-50
3.6.11 PCB insp result disp 2-51
3.6.12 Maintenance display 2-52
3.6.13 CSV Auto Output Per PCB 2-53
3.6.14 Screen of function restriction for Operator 2-54
3.7 Engineer Mode 2-55
3.7.1 Data transfer 2-56
3.7.2 LED diag (Option) 2-57
4. Inspection Program 2-59
4.1 Creating new PCB data (printed PCB) 2-59
4.2 Editing PCB Data 2-69
4.2.1 Image Editing 2-70
4.2.2 PCB Editing 2-74
4.2.3 Light Intensity Adjustment 2-75
4.2.4 Field of View Editing 2-83
4.3 Spec Data Editing 2-84
4.4 Automatic Zero Level Setting 2-86
4.5 Saving the Camera Image 2-92
5. Maintenance Method 2-93
5.1 Precautions 2-93
5.2 Maintenance Parts 2-93
5.3 Troubleshooting 2-93
5.4 Error Code List 2-94
Chapter 3 Optional Functions
1. 2D Code Setting 3-1
1.1 Flow of Inspection (2D code reading) 3-1
1.2 2D Code Inspection Specifications 3-2
1.3 How to Conduct 2D Inspection 3-2
1.4 Light Amount Adjustment 3-4
1.5 Skipping 2D Code Inspection 3-6
1.6 If There Is a 2D Code Read Error 3-7
2. Extension Conveyor unit 3-9
2.1 Overview of extension conveyor unit 3-9
2.2 Procedures for visual inspection in extension conveyor unit 3-10