80S-2080F480F4-680F5 User’s Manual.pdf - 第397页

6 What should you do ... ? SIPLACE 80S-20/F4/F4-6/F5 User’s Manual 6.2 When you switch off the SIPLACE line Edition 03/98 from Software Version SR.404.xx 6 - 6 6.2 When you switch off the SIPLACE line ATTENTION Before yo…

100%1 / 744
SIPLACE 80S-20/F4/F4-6/F5 User’s Manual 6 What should you do ... ?
Edition 03/98 from Software Version SR.404.xx 6.1 When you switch on the SIPLACE line
6 - 5
Fig. 6.1.2 Flow chart: "Switching on the SIPLACE line“
Test set-up
Reset tracks
No
Line computer tasks
Load cluster data
Fiducials
OK?
Make settings on the machine
Set-up generator appears
Check the set-up
(insert feeder modules)
Switch on
Nozzle check
Change nozzle
configuration, if necessary
Wait for PCB
Introduce PCB
Track
Yes
Abort
placement
No
PCB onto ourput conveyor
Yes
Station computer
Bold :
Italic :
To be carried out
by the operator
Carried out and
signaled by
the machine
Confirm the set-up generator
6 What should you do ... ? SIPLACE 80S-20/F4/F4-6/F5 User’s Manual
6.2 When you switch off the SIPLACE line Edition 03/98 from Software Version SR.404.xx
6 - 6
6.2 When you switch off the SIPLACE line
ATTENTION
Before you switch off the line ALWAYS make sure that:
All the placement and gluing operations at the stations have ended.
The z-axes of all placement and adhesive heads are in the top end position.
None of the placement heads still contain components.
All of the gantries have moved into the standby position.
The station computers are shut down safely.
6.2.1 Switching off the line computer
CAUTION
NEVER just switch the line computer off at the power switch.
ALWAYS shut down the operating system. Otherwise you will almost certainly lose a lot of data or corrupt the
programs and you may have to reinstall the line computer software.
Position the mouse at the top or bottom right edge of the screen. The cursor will change into a cross.
Hold down the left mouse button. The main menu will appear on screen.
Move the mouse cursor onto ’Shutdown’ and then release the mouse button. The following dialog box will
appear on screen:
Click on ’Yes’. The dialog box will close and the software will shut down. This operation takes around 1
minute.The following box will then appear:
Switch off the UPS and monitor.
Shut down the computer
Yes No
Safe to Power Off
Press any key to reboot
SIPLACE 80S-20/F4/F4-6/F5 User’s Manual 6 What should you do ... ?
Edition 03/98 from Software Version SR.404.xx 6.2 When you switch off the SIPLACE line
6 - 7
6.2.2 Switching off the stations
ATTENTION
When an automatic placement system is in use, NEVER just power it off at the main switch (apart from in an emer-
gency).
The station computer runs under the WINDOWS NT operating system. You must shut down the operating
system correctly before switching off the station. The procedure for switching off the station is as follows:
End all placement and gluing operations.
Check that the z axes of all placement and glue application heads are in their top end position.
Check whether there are still components on the placement heads.
Move all gantries into the standby position.
Click on the ’Shut down computer’ option in the ’Operation’ menu.
This will end all the processes running on the station computer. A prompt will then appear on screen, tell-
ing you that you can safely switch off the computer.
You can now switch off the placement system at the main switch.
PLEASE NOTE:
If you switch off the placement system while it is in use without first correctly shutting down the station com-
puter, the computer might not start again the next time you start up the line.