2OM-1733-005w_F8.pdf - 第165页
2OM-1733 2-3-31 Note The items in the following (a) and (b), are available depending on options installed. (a) The settings "(D02_03)", "(D02_04)", "(D02_05)" and "(D02_06)" are av…

2OM-1733
2-3-30
(D02) PCB locate
When the [PCB locate] tab is pressed in the "Control" window, the following
tab sheet appears.
Fig. 2B3-30
F2B3-31 Using vacuum support
Note
The vacuum support is an optional function.
Graphic
Development
1403-004
3.4 Control

2OM-1733
2-3-31
Note
The items in the following (a) and (b), are available depending on options
installed.
(a) The settings "(D02_03)", "(D02_04)", "(D02_05)" and "(D02_06)" are
available in the Y510 mm Single Transfer Unit (Option).
(b) The settings "(D02_07)", "(D02_08)", "(D02_09)" and "(D02_10)" are
used when the vacuum support (option) has been enabled.
(D02_01)
PCB detection off DLY
The time period from the PEC recognition to PCB release is set in this text
box.
(D02_02)
PCB locate SET
Common :
When selected, the PCB positioning is set commonly to the
machines in the line.
Individual :
When selected, the PCB positioning is set individually for each
machine in the line.
(D02_03)
PCB locate Sequence
The PCB positioning mode is set in this text box.
Standard
: When selected, the positioning operation for the
backup base is started at the same time with the
positioning operation for the Z-clamp.
Change Z clamp timing
: During the course of the positioning operation
for the back-up base, the Z-clamp movement is
started.
Only vacuum support
: When selected, the positioning is performed
using the vacuum support jig. (option)
(D02_04)
UP
Positioning 1, Positioning 2
MOVE
For the PCB positioning moving-up operation, select the mode from the
following mode items.
Normally, "Standard" is selected.
Standard
:
When selected, the PCB is moved up for positioning
based on the standard value set in the machine.
Low Speed 1
:
When selected, the operation speed is one step lower
than the standard value.
Low Speed 2
:
When selected, the operation speed is two step lower
than the standard value.
Low Speed 3
:
When selected, the operation speed is three step lower
than the standard value.
1403-004
3.4 Control

2OM-1733
2-3-32
Low Speed 4
:
When selected, the operation speed is four step lower
than the standard value.
Value Set
: When selected, the speed value can be set freely.
1st speed DCLR SET
The deceleration rate in the backup base rst stage operation in the PCB
positioning operation, is set in this text box. This value is reected in the
speed and acceleration.
2nd speed DCLR SET
The deceleration rate in the backup base second stage operation in the PCB
positioning operation, is set in this text box. This value is reected in the
speed and acceleration.
Z Clamp
Opr. waiting time
The Z-clamp operation WAIT time is set in this text box.
Note
This item is always available.
(This is available regardless of the Y510mm Single Transfer Unit
(option)).
Opr. ST DLY timer
The time period from the backup base moving up start to Z-clamp moving
up start, is set in this text box.
(D02_05)
DN
Positioning 1, Positioning 2
MOVE
For the PCB positioning moving-down operation, select the mode from the
following mode items.
Normally, "Standard" is selected.
Standard
:
When selected, the PCB is moved up for positioning
based on the standard value set in the machine.
Low Speed 1
:
When selected, the operation speed is one step lower
than the standard value.
Low Speed 2
:
When selected, the operation speed is two step lower
than the standard value.
Low Speed 3
:
When selected, the operation speed is three step lower
than the standard value.
Low Speed 4
When selected, the operation speed is four step lower
than the standard value.
Value Set : W
hen selected, the speed value can be set freely.
1403-004
3.4 Control