2OM-1733-005w_F8.pdf - 第169页

2OM-1733 2-3-35 (D02_10) DN MOVE The PCB moving down operation for positioning is selected from "Standard" or "Value Set". Normally, "Standard" is selected. Standard : When selected, the PCB…

100%1 / 358
2OM-1733
2-3-34
(D02_09)
UP
MOVE
The PCB moving up operation for positioning is selected from "Standard" or
"Value Set".
Normally, "Standard" is selected.
Standard :
When selected, the PCB is moved up for positioning
based on the standard value set in the machine.
Value Set :
When selected, the speed value can be set freely.
1st speed DCLR SET
The deceleration rate in the backup base rst stage operation in the PCB
positioning operation, is set in this text box. This value is reected in the
speed and acceleration.
2nd speed DCLR SET
The deceleration rate in the backup base second stage operation in the PCB
positioning operation, is set in this text box. This value is reected in the
speed and acceleration.
Vac. Ctrl. delayed starts
The time period from the backup base rst stage operation start in the PCB
position operation to the vacuum pick-up turned ON, is set in this test box.
Vac. Wtg. Timer
The time period from the backup base rst stage operation completion in the
PCB positioning operation to the second stage operation startup, is set in this
text box.
Z clamp waiting time
The time period for judging the Z-clamp moving-up operation completion in
the PCB positioning operation, is set in this text box.
1212-002
3.4 Control
2OM-1733
2-3-35
(D02_10)
DN
MOVE
The PCB moving down operation for positioning is selected from "Standard"
or "Value Set".
Normally, "Standard" is selected.
Standard :
When selected, the PCB is moved up for positioning
based on the standard value set in the machine.
Value Set :
When selected, the speed value can be set freely.
1st speed DCLR SET
The deceleration rate in the backup base rst stage operation in the PCB
position clearing operation, is set in this text box. This value is reected in
the speed and acceleration.
2nd speed DCLR SET
The deceleration rate in the backup base second stage operation in the PCB
position clearing operation, is set in this text box. This value is reected in
the speed and acceleration.
Vac. Ctrl. delayed starts
The time period from the PCB position clearing operation start to the vacuum
pick-up turned OFF, is set in this text box.
Vac. Wtg. Timer
The time period from the rst stage operation completion in the PCB position
clearing operation completion to the second stage operation startup, is set in
this text box.
Damaged Vac. Wtg. time
The operation time period for the vacuum breakage turned ON in the PCB
position cleaning operation, is set in this text box.
Backup axis DN start DLY
The time period until the backup base rst stage operation startup in the PCB
position cleaning operation, is set in this text box.
1212-001
3.4 Control
2OM-1733
2-3-36
(D03) Transfer speed
When the [Transfer Speed] tab is pressed in the "Control"window, the
following tab sheet appears.
Fig. 2B3-32
Graphic
Development
1212-002
3.4 Control