2OM-1733-005w_F8.pdf - 第167页
2OM-1733 2-3-33 1st speed DCLR SET The deceleration rate in the backup base rst stage operation in the PCB position clearing operation, is set in this text box. This value is reected in the speed and acceleration. 2nd …

2OM-1733
2-3-32
Low Speed 4
:
When selected, the operation speed is four step lower
than the standard value.
Value Set
: When selected, the speed value can be set freely.
1st speed DCLR SET
The deceleration rate in the backup base rst stage operation in the PCB
positioning operation, is set in this text box. This value is reected in the
speed and acceleration.
2nd speed DCLR SET
The deceleration rate in the backup base second stage operation in the PCB
positioning operation, is set in this text box. This value is reected in the
speed and acceleration.
Z Clamp
Opr. waiting time
The Z-clamp operation WAIT time is set in this text box.
Note
This item is always available.
(This is available regardless of the Y510mm Single Transfer Unit
(option)).
Opr. ST DLY timer
The time period from the backup base moving up start to Z-clamp moving
up start, is set in this text box.
(D02_05)
DN
Positioning 1, Positioning 2
MOVE
For the PCB positioning moving-down operation, select the mode from the
following mode items.
Normally, "Standard" is selected.
Standard
:
When selected, the PCB is moved up for positioning
based on the standard value set in the machine.
Low Speed 1
:
When selected, the operation speed is one step lower
than the standard value.
Low Speed 2
:
When selected, the operation speed is two step lower
than the standard value.
Low Speed 3
:
When selected, the operation speed is three step lower
than the standard value.
Low Speed 4
When selected, the operation speed is four step lower
than the standard value.
Value Set : W
hen selected, the speed value can be set freely.
1403-004
3.4 Control

2OM-1733
2-3-33
1st speed DCLR SET
The deceleration rate in the backup base rst stage operation in the PCB
position clearing operation, is set in this text box. This value is reected in
the speed and acceleration.
2nd speed DCLR SET
The deceleration rate in the backup base second stage operation in the PCB
position clearing operation, is set in this text box. This value is reected in
the speed and acceleration.
Backup axis DN start DLY
The time period for the Z-clamp releasing operation completion after the
component placement completion, is set in this text box. After this operation
is completed, the backup base starts moving down.
(D02_06)
SW POSN of 1st / 2nd
The change position from the rst speed to the second speed is set in this text
box.
(D02_07)
Replace vacuum sensor
The sensor to be used for the vacuum pick-up is selected in this text box.
This function is used when the vacuum judgment threshold value is to be
changed.
Sensor 1 :
When selected, the vacuum pick-up is performed using
the sensor #1.
Sensor 2 :
When selected, the vacuum pick-up is performed using
the sensor #2.
(D02_08)
PCB posotion of contact
The offset from the feeding position (First stage in moving-up / First stage
target position in moving-down) is set in this text box. The value for the
carrier thickness, etc., is entered as the upper direction (+ value).
1403-004
3.4 Control

2OM-1733
2-3-34
(D02_09)
UP
MOVE
The PCB moving up operation for positioning is selected from "Standard" or
"Value Set".
Normally, "Standard" is selected.
Standard :
When selected, the PCB is moved up for positioning
based on the standard value set in the machine.
Value Set :
When selected, the speed value can be set freely.
1st speed DCLR SET
The deceleration rate in the backup base rst stage operation in the PCB
positioning operation, is set in this text box. This value is reected in the
speed and acceleration.
2nd speed DCLR SET
The deceleration rate in the backup base second stage operation in the PCB
positioning operation, is set in this text box. This value is reected in the
speed and acceleration.
Vac. Ctrl. delayed starts
The time period from the backup base rst stage operation start in the PCB
position operation to the vacuum pick-up turned ON, is set in this test box.
Vac. Wtg. Timer
The time period from the backup base rst stage operation completion in the
PCB positioning operation to the second stage operation startup, is set in this
text box.
Z clamp waiting time
The time period for judging the Z-clamp moving-up operation completion in
the PCB positioning operation, is set in this text box.
1212-002
3.4 Control