YCP10 Users_E.pdf - 第101页

4-5 4 Daily operation 4. Changing the conveyor unit setup When producing boards that are different from the previous production board, you need to change the conveyor unit setup to match the selected board. (This procedu…

100%1 / 288
4-4
4
Daily operation
3. Selecting the board data
To start board production, first select the board data from the list of board data already created beforehand.
1
Select the board data.
1. When the board data is not yet selected, press the [Board] button on the Setup screen.
A list of board data appears.
2. Line up the cursor with the board data to be produced and press the [OK] button.
The machine loads the selected board data.
[Board] button
Selecting the board
Select board data from list.
Selected board data
name is displayed.
64404-N1-10
2
Check the board data.
Check that the selected board data name is shown in the status area. Also check that the displayed
board size, mask size and squeegee type are correct.
Setup screen after selecting board data
Selected board name
Board size
Mask size
Squeegee type
64405-N1-10
4-5
4
Daily operation
4. Changing the conveyor unit setup
When producing boards that are different from the previous production board, you need to change the
conveyor unit setup to match the selected board. (This procedure is not necessary when you are producing
the same board as last time.)
c
CAUTION
When producing board whose width is narrower than the previous production board, remove in advance the matrix
pins (or board support jigs) from the push-up plate.
1
Open the [Unit]-[Conveyor] tab.
The buttons on this screen are used in the following steps to change the conveyor unit setup.
[Unit]-[Conveyor] tab
Step 2:
[SW. Prod. Position] button
Step 5:
[Convey In] button
64406-N1-10
2
Press the [SW. Prod. Position] button.
Select the setup item.
1. When rearranging the backup pins, select “Transfer Check Position”. The conveyor will move to the
setup position and the conveyor width will be automatically adjusted to match the board size.
2. When changing the whole matrix plate, select “Backup Setup”. The conveyor will move to the setup
position and the conveyor will be adjusted to the maximum width, allowing you to remove the matrix
plate.
n
NOTE
When removing the matrix plate, check for safety and then lift it straight up while holding firmly with both hands.
“Move table to setup position” screen
64407-N1-00
4-6
4
Daily operation
e
3
Set the matrix pins (or board support jigs).
Press the emergency stop button and open the upper door. Arrange the matrix pins on the push-up
plate according to the width of a production board. When using optional board support jigs, they can
also be used together with the matrix pins.
OK
Not OK
Arranging the matrix pins
Matrix pins
(When board support jigs and matrix pins are used together)
Board support jig
Board support jig
Machine front side
Matrix plate
Matrix pins
Matrix plate
63402-N1-00
n
NOTE
When the matrix pin arrangement has been input by pressing the [Backup Pin Pos.] button on the [Print]-[Board] tab
screen, this is convenient to arrange the matrix pins. (For more details, see "3. Matrix pin arrangement" in Chapter 7.)
4
Cancel emergency stop.
Close the upper door, release the emergency stop button and press the [READY] button on the
operation panel.
5
Press the [Convey In] button to load a board.
Load a board by following the message that appears on the screen, and the board will be
automatically clamped in printing position.
e
6
Check that the board is uniformly clamped on the conveyor.
After pressing the emergency stop button, lightly press and tap on the board by hand to check that
there is no warp or play in the board.