(14) Power on time Shown is the time when the control power of the machine is ON. Sample Display 10:03' 50"(10 hours, 3 minutes, 50 seconds) Auto run time Shown is the time when the machine was running automati…

100%1 / 383
(13) Warm-up run (Test Mode)
The data of the warm-up run (dry cycle) is counted.
P.C.B. counter
The number of P.C.B.’s is counted when the machine is operated
under the following condition.
"ENABLE" set for "TEST RUN" in "Run Mode" Tab Sheet ("OPN.
MODE" Window)
"PCB XFR Err Det Disabled" Check Box Checked
(State in which no P.C.B. is put in and out)
Not Picked Counts
The number of non-handling/non-placement actions is counted
when the machine is operated under the following condition.
"ENABLE" set for "TEST RUN" in "Run Mode" Tab Sheet
("OPN. MODE" Window)
"Handling/Place Disabled" and "Vacuum/Blower Disabled"
Check Boxes Checked
The number of non-handling and placement actions is
counted although the rotary turret takes running actions.
3.2 "Machine Performance Data" Tab
0403-001 4-15-1 AIL01EDTP
Note
(14) Power on time
Shown is the time when the control power of the machine is ON.
Sample Display
10:03' 50"(10 hours, 3 minutes, 50 seconds)
Auto run time
Shown is the time when the machine was running automatically.
When a pattern program is set as the current one several times,
the sum total is computed.
Placement time
Shown is the time required to finish a P.C.B. (from first to last
component placement on a product P.C.B.).
The essential component placement time is summed up.
While the machine is set in the "STOP" or the "PAUSE"
mode or a step operation is performed, the time is not mea
sured.
This is used to calculate the average placement tact time
per component.
P.C.B. transfer time
Shown is the period of time during which each motor (motors
to drive the L conveyor, the transfer conveyor, the P.C.B. trans
fer, and the R conveyor) is being activated.
P.C.B. wait
Input wait
Shown is the time measured when the machine is completely
in the waiting mode (the machine is waiting for a P.C.B. to be
loaded from the input machine).
Output wait
Shown is the time measured when the machine is completely
in the waiting mode (the machine is waiting for a P.C.B. to be
unloaded to the output machine).
P.E.C./B.B.R.
Shown is the period of time during which the machine is taking
P.E.C. recognition and B.B.R. detection actions.
Counted is the period of time during which the X/Y table starts
moving and the P.E.C. recognition and B.B.R. detection are com-
pleted.
Others
Shown is the period of time during which the machine takes ac-
tions other than the above-described ones.
Included are the periods of time during which the F-axis takes
actions before component placement, the X/Y table returns af-
ter component placement, etc.
3.2 "Machine Performance Data" Tab
0403-002 4-16 AIL01EDTP
Note
Note
Stop time
Shown is the period of time during which component placement
operation is interrupted for component replenishment, etc.
Error stop
Error alarm
Shown is the period of time during which an alarm (light tower
ON) is issued.
Recovery
Shown is the time between error cancellation and restart of
machine operation.
Feeder Reload
Shown is the period of time during which components are sup-
plied.
Others
Shown is the period of time during which the machine performs
the set-up, program change, idling operations, etc.
(15) Maintenance time
Shown is the period of time during which the [OPERATION] switch
on the front operation panel is set to the "SETUP" side.
(16) Warm-up run time (Test Mode)
The running time is counted when the machine is operated under
the following condition.
"ENABLE" set for "TEST RUN" in "Run Mode" Tab Sheet ("OPN.
MODE" Window)
"PCB XFR Err Det Disabled" Check Box Checked
(State in which no P.C.B. is put in and out)
(17) Test mode time
Shown is the period of time during which test run is performed
according to the test mode parameters.
3.2 "Machine Performance Data" Tab
0403-002 4-17 AIL01EDTP