N7201A616E00_0317.pdf - 第157页

NPM-W 2 EJM7DE-MB-02O-0 0 OFF SERVO 2-5-1 -2 When you cannot reach the nozzle changer/ dummy dispensing unit, use a stepstool. 2 3 4 5 1 Push the X-axis inward Detach the feeder cart ( → [Maintenance] P.3-2) To Preparati…

100%1 / 714
NPM-W2 EJM7DE-MB-02O-00
Operating procedure
2-5-1
2-5-1-1
1
+
1
Open the safety cover
3
4
5
to
Individu-
al
prepara-
tion
How to move X-axis automatically
The method to move X-axis either automatically or manually is explained.
(X-axis drive units of the front and rear
sides move to their center)
Servo switch OFF
Detach the feeder cart
([Maintenance] P.3-2)
2
Replacing the nozzle
changer/ dummy dispensing
unit/calibration jig 1
NPM-W2 EJM7DE-MB-02O-00
OFF
SERVO
2-5-1-2
When you cannot reach the nozzle changer/dummy dispensing unit, use a stepstool.
2
3
4
5
1
Push the X-axis
inward
Detach the
feeder cart
([Maintenance]
P.3-2)
To
Preparation
NPM-W2 EJM7DE-MB-02O-00
2-5-1-3
Operating procedure
2-5-1
Individu-
al
prepara-
tion
Replacing the nozzle
changer/ dummy dispensing
unit/calibration jig 2
How to change the nozzle changer/dummy dispensing unit/calibration jig
The placement head is used to describe how to replace the nozzle changer while the dispensing head and
inspection head are used, respectively, for the dummy dispensing unit and calibration jig. This section
describes how to replace the nozzle changer as an example.
5
6
For 3-nozzle head
For light weight 16-/12-/8-nozzle head
Attach the new nozzle changer
Slide it after aligning [] with [].
Lever
Remove the nozzle changer
2
1
1 2
Fold the lever to the left Remove the nozzle changer