N7201A616E00_0317.pdf - 第268页
NPM-W 2 EJM7DE-MB-03 O-00 OFF SERVO 3-4 -1 Setting pr oduction ma terials 1 (dispensing head) It explains in the case that the dispensing head is a ttached to the rear side and operation is performed from the front side.…

NPM-W2 EJM7DE-MB-03O-00
3-3-4-2
Production

NPM-W2 EJM7DE-MB-03O-00
OFF
SERVO
3-4-1
Setting production
materials 1 (dispensing head)
It explains in the case that the dispensing head is attached to the rear side and operation is performed
from the front side.
Operating procedure
3-4
1
ENABLING
2 3
Move the head to
the replace
position
6
Detach a syringe
Pull the syringe straight up.
Syringe
1
2
1
2
Θ-axis
●Be careful not to apply force to the protection cover
for the X-axis linear scale during syringe replacement.
There is possibility for interference with the linear
scale reading head due to cover deformation.
SC-axis
Lock plate
●Be careful not to turn the gear of SC-axis in a
clockwise direction during syringe replacement,
otherwise, adhesive may leak.
Linear scale
protection cover
Turn the lock plate clockwise to
release the syringe lock.

NPM-W2 EJM7DE-MB-03O-00
4
3-4-2
To
10
9
7
Attach the
nozzle to the
screw unit
5
Disconnect the
joint from the
syringe
■Material setting for new production
■Syringe replacement
Disconnect the
air plug
1
2
8
●Align the nozzle guide pin
with the nozzle
holder groove.
Groove
Guide
pin
joint
Remove the
screw unit from
the syringe
Production
Cover the multi-
recognition
camera, nozzle
changer
with a waste cloth
●Turn the syringe tip
counter-clockwise as
viewed from above.