N7201A616E00_0317.pdf - 第487页

NPM-W 2 EJM7DE-MB-06 O-00 6-2-9 -10 Setting change 5 + ● Align the cross line to the top of the component. Align the cross line to the edge of a component ● The edge face of the compone nt to align the cross line differs…

100%1 / 714
NPM-W2 EJM7DE-MB-06O-00
6-2-9-9
Produc-
tion data
teaching
Placement coordinates
teach 5
Operating procedure
6-2-9
1
1 7
2
3
+
and
and
or
4
When components are placed
on the PCB, go to step
When components are not
placed on the PCB, go to
step
5
7
Perform on both and .
2 3
Perform steps from through
in [Teaching with component
(measuring method: 1 point) ]
Teaching with component (measuring method: 2 point) 1
NPM-W2 EJM7DE-MB-06O-00
6-2-9-10
Setting
change
5
+
Align the cross line to the top of the
component.
Align the cross line to the edge
of a component
The edge face of the component to align the
cross line differs depending on component
placement angle. (See below)
6
+
Align the cross line to the right side of the
component.
The edge face of the component to align the
cross line differs depending on component
placement angle. (See below)
Angle
0° 90° 180° -90°
Position
Measure 1
Measure 3
Measure 2
Measure 4
Component edge face to align the cross line
6
5
are selected
are selected
When and
When and
Notice1 (P.6-2-9-7)
NPM-W2 EJM7DE-MB-06O-00
6-2-9-11
Produc-
tion data
teaching
Placement coordinates
teach 6
Operating procedure
6-2-9
7
+
Align the cross line to the top of the component
electrode.
Align the cross line to an
electrode on the PCB
The edge face of the component to align the
cross line differs depending on regular
component placement angle. (See below)
8
+
Align the cross line to the right of the
component electrode.
The edge face of the component to align the
cross line differs depending on regular
component placement angle. (See below)
Angle
0° 90° 180° -90°
Position
Measure 1
Measure 3
Measure 2
Measure 4
Electrode position on a PCB align the cross line
+
8
7
are selected
are selected
When and
When and
Teaching with component (measuring method: 2 point) 2
Notice1 (P.6-2-9-7)