N7201A616E00_0317.pdf - 第344页

NPM-W 2 EJM7DE-MB-05O-0 0 This is us ed to identify an d take meas ures against the ca uses of def ects in cas es where a certain component produces a high concen tration of defects. Inspection monitor 3 Operating proced…

100%1 / 714
NPM-W2 EJM7DE-MB-05O-00
G
H
Selects the NG location of the first
component.
5-4-3-4
J
I
K
L
M
Switches between component and solder
inspection maps, and displays the
current inspection map.
When the map can be switched
between component and solder
inspection maps, the component
inspection map is displayed in
preference to solder inspection map.
(Returns to production condition)
The signal tower turns green.
The buzzer stops sounding.
Displays information on solder defect
judgment on the next component.
Displays information on solder defect
judgment on the next identical
component.
Displays information on solder defect
judgment on the last identical component.
Switches between lanes. After a PCB is
unloaded;
If the inspection result of a selected
lane is OK and if the inspection result
of the opposed lane is NG, it switches
to the opposed lane because higher
priority is given to NG information.
When the inspection results of both
lanes are either OK or NG, it is not
switched over to the other lane.
Solder
inspection
NPM-W2 EJM7DE-MB-05O-00
This is used to identify and take measures against the causes of defects in cases where a certain component
produces a high concentration of defects.
Inspection monitor 3
Operating procedure
5-4-3
Produc-
tion
5-4-3-5
Error Cnt
Err Rate
InspectNum
CompName
The number of components judged as
defective in inspection.
(The number of errors/ the number of
inspection ) x 100(%)
A
B
D
E
C
F
Scrolls to display a long component name.
Switches between component inspection
and solder inspection.
1
Component
1
B
C D EA
F
2
NPM-W2 EJM7DE-MB-05O-00
G
(Displays detailed error information)
A
B
E
F
C
D
BA C D E F
G
5-4-3-6
Returns to the previous screen.
2
Shape
Other
Position
The number of displacement inspection
errors.
Fill
The number of shape errors.
The number of other errors.
Perva
Bridging
The number of bridging inspection errors.
The number of blur inspection errors.
The number of oozing inspection errors.
Solder
inspection