N7201A616E00_0317.pdf - 第289页

NPM-W 2 EJM7DE-MB-04 O-00 4-4-1 2 2 1 3 + Star ting pr oduction Operating procedure 4-4-1 Produc- tion When the production data teach ends, the produ ction starts. ● Ensure that the p ower su pply of the peripheral de vi…

100%1 / 714
NPM-W2 EJM7DE-MB-04O-00
Operating procedure
4-3-2
1
When the mode is comment
1
(The screen where you select the
component to check its image condition
is displayed.)
2
3
5
4
Enter the pattern number and
the comment
2
3
(The comment information that matches
the entered data is displayed on the
screen.)
4
+
The head moves to the selected
component position.
5
Produc-
tion data
and
teach
Capturing the images of
teaching PCB
(PCB after component
placed)
4
Returns to the next layer up.
4-3-2-7
Change each lighting value of coaxial1,
coaxial2, middle angle and lower angle
then adjust the image which is suitable
for inspection.
Check the screen for the imaging
capability suitable for inspection while
changing each lighting value.
In adopting the adjusted lighting value to
inspection condition, record the adjusted
value
6
6
NPM-W2 EJM7DE-MB-04O-00
4-4-1
2
2
1
3
+
Starting production
Operating procedure
4-4-1
Produc-
tion
When the production data teach ends, the production starts.
Ensure that the power supply of the peripheral devices such as barcode reader is turned ON when
starting the production.
When an error occurs during self-diagnosis, the
corresponding item will be shown. Handle the error
accordingly.
NOTICE
Servo switch ON
Component
inspection
NPM-W2 EJM7DE-MB-04O-00
4-4-2-1
Operating procedure
4-4-2
1
1
A B C D
PCB
The number of NG PCBs / the number of
PCB skip including the PCB pass.
Ptn
The number of NG patterns / the
number of patterns actually inspected.
Cycle time
Cycle time 1:
The time (sec) elapsing between the
completion of clamping prior to placement
and the moment before the release of
clamping after the end of placement.
Cycle time 2:
The time (sec) for transporting, PCB waiting
and PCB loading
Num Isp view
The number of views inspected until now
/ the total number of inspection views
Process wait
Load wait:
Waiting for PCBs to be loaded from the
machine in the upstream process.
Unload wait:
Waiting for the machine in the downstream
process to be come ready for loading PCBs
Produc-
tion
Status monitor
E F GHE EF
A
B
C
D
E
You can check the inspection result of production PCB.
When is displayed