N7201A616E00_0317.pdf - 第337页
NPM-W 2 EJM7DE-MB-05 O-00 5-4-1 When the production data teach ends, the produ ction starts. 2 2 Star ting pr oduction Operating procedure 5-4-1 ● Ensure that the p ower su pply of the peripheral de vices such a s bar co…

NPM-W2 EJM7DE-MB-05O-00
Capturing the images
of teaching PCB 4
Operating procedure
5-3-2
1
■When the mode is a comment
1
(The screen where you select the
component to check its image condition
is displayed.)
2
3
5
4
Enter the pattern number and
the comment
2
3
(The comment information that matches
the entered data is displayed on the
screen.)
4
+
●The head moves to the selected
component position.
5
Produc-
tion data
and
teach
5-3-2-7
(Returns to the next layer up.)
6
6
●Change each lighting value of coaxial1,
coaxial2, middle angle and lower angle
then adjust the image which is suitable
for inspection.
●Check the screen for the imaging
capability suitable for inspection while
changing each lighting value.
●In adopting the adjusted lighting value to
inspection condition, record the adjusted
value

NPM-W2 EJM7DE-MB-05O-00
5-4-1
When the production data teach ends, the production starts.
2
2
Starting production
Operating procedure
5-4-1
●Ensure that the power supply of the peripheral devices such as barcode reader is turned ON when
starting the production.
Servo switch ON
1
3
+
Produc-
tion
When something abnormal occurs during self-
diagnosis, an error item is displayed. Please
handle the error accordingly.
NOTICE
Solder
inspection

NPM-W2 EJM7DE-MB-05O-00
Operating procedure
5-4-2
1
1
A B C D
PCB
The number of NG PCBs / the number of
PCB skip including the PCB pass.
Ptn
The number of NG patterns / the
number of patterns actually inspected.
Cycle time
Cycle time 1:
The time (sec) elapsing between the
completion of clamping prior to placement
and the moment before the release of
clamping after the end of placement.
Cycle time 2:
The time (sec) for transporting, PCB waiting
and PCB loading
Num Isp view
The number of views inspected until now
/ the total number of inspection views
Process wait
Load wait:
Waiting for PCBs to be loaded from the
machine in the upstream process.
Unload wait:
Waiting for the machine in the downstream
process to be come ready for loading PCBs
Produc-
tion
Status monitor
E F GHE EF
A
B
C
D
E
You can check the inspection result of production PCB.
5-4-2-1
■When is displayed