N7201A616E00_0317.pdf - 第199页

3 Production

100%1 / 714
NPM-W2 EJM7DE-MB-02O-00
Preparation in
independent mode
You can prepare for the lane during production in the independent mode.
1
2
The lane under cycle stop is
displayed in yellow color.
2-8
Operating procedure
2-8
2
3
3
(P.2-3-2 to P.2-5-5)
(3-1-1)
(P.3-1-2)
1
Select a lane on the screen in
production and perform cycle
stop
Displays step screen.
When you resume production
+
3 Production
NPM-W EJM2DE-MB-03O-05
Produc-
tion
Production start 1
Starting production
3-1-1-1
Operating procedure
3-1-1
Describes how to start production. It is the operator’s daily task.
Check that the emergency stop switch is released.
To release, make sure that danger or
abnormality is removed, and then turn the
switch to the right.
1
Check before operation
Check that there is no foreign
matter on the conveyor or the
feeder table.
5
Self-diagnosis is conducted
4
For abnormal case
Abnormal items are displayed .
(P.3-1-1
-2)
For normal case
Origin return is carried out.
Check that the front and
rear safety covers are
closed.
2
3
Start production
ENABLING
START
1
2
3
Production
start
For alternate mode
For independent mode
(P.3-1-1
-2)