N7201A616E00_0317.pdf - 第224页

NPM-W 2 EJM7DE-MB-03O-0 0 3-2-2 -3 C A D C A Items on the table is switched to the ones related to in spection infor mation. Bad pattern ● Rate: Defe ct patterns/Produced pa tterns ● Quantity: Defect patterns Inspection …

100%1 / 714
NPM-W2 EJM7DE-MB-03O-00
3-2-2-2
B A
EDC
C
D
E
F
Operating time
RealOpTime
For single lane mode:
Time that previous and next processes
waiting time and stop time caused by error
are subtracted from time in production
mode.
(RealOpeTime
OpeTime - Total Stop time)
For dual lane mode:
me that previous and next processes
waiting time, stop time caused by error
and transfer time are subtracted from time
in production mode.
(RealOpeTime
OpeTime - Total Stop time-Transfer
time)
ProcWaitTime
Preparation time for previous and next
processes.
SupplyWaitTime
Waiting time for component supply.
StopTime
Downtime during production.
OpTime
Time that the machine is in production
mode.
Clears production information.
Total time
Shows the previous or next table.
Preparation time
Production
NPM-W2 EJM7DE-MB-03O-00
3-2-2-3
C
A
D
C
A
Items on the table is switched to the ones
related to inspection information.
Bad pattern
Rate: Defect patterns/Produced patterns
Quantity: Defect patterns
Inspection information (inspection head only)
B
B
Bad PCB
Rate: Defect PCBs/Produced PCBs
Quantity: Defect patterns
D
Bad components [ppm]
Rate: Defect components/(Produced
PCBs x Inspection components in PCB)
Quantity: Defect components
Produc-
tion
informa-
tion
Operating procedure
3-2-2
Operating information
2
NPM-W2 EJM7DE-MB-03O-00
3-2-2-4
Production