YSD_Users_E.pdf - 第370页

Chapter 2 Daily maintenance items Contents Before beginning maintenance 2-1 1. Cleaning the nozzles 2-2 1.1 Checking the head dispensing 2-2 1.2 Cleaning the nozzles 2-3

100%1 / 401
1-5
1
Maintenance
2.3 Required tools
Prepare the following tools and items necessary for maintenance.
n
Tool list
: Supplied with machine, : Options
Name Description
Phillips screwdriver Large, small
Slotted (flat-blade) screwdriver Large, small
Hex wrench set 1 set
Grease gun For grease filling (See section 2.2.)
Air blow tool For cleaning (KU4-M8590-00X)
Precision wrench set Used for maintenance of spline shafts.
Cleaning pin Used to clean nozzle holes.
n
Other tool list
: Supplied with machine, : Options
Name Description
Grease (lithium-based grease: NSL) Used to lubricate X and Y axes.
Cleaning paper Use lint-free cleaning paper or cloth that does not leave dust or residue.
Cleaning alcohol Use IPA (isopropyl alcohol) or ethanol.
Marker pen Used for marking when replacing conveyor belt.
n
Safety protective equipment
Name Description
Dust goggles
Always wear when handling IPA or air blow gun.
Dust mask
Chapter 2 Daily maintenance items
Contents
Before beginning maintenance 2-1
1. Cleaning the nozzles 2-2
1.1 Checking the head dispensing 2-2
1.2 Cleaning the nozzles 2-3
2-1
2
Daily maintenance items
Before beginning maintenance
In most cases, the main power must be turned off before beginning maintenance work.
However, some work is carried out in an emergency stop state while the power is on. In that case, ensure
sufficient safety and press the emergency stop button before beginning the work.
If you need to check the machine operation such as axis movement, leave the power turned on and also
ensure sufficient safety during maintenance.
When operating the machine, the following conditions must be met.
n
Operating conditions
1. Air pressure is at an appropriate level.
2. Safety covers are closed.
3. Nozzles and other devices are set in place correctly.