YSD_Users_E.pdf - 第60页
Chapter 2 Basic operation Contents 1. Before operation 2-1 1.1 Starting the machine 2-1 1.2 Canceling emergency stop 2-3 1.3 Clearing an error 2-4 1.4 T urning of f the machine power 2-5 2. Operation screen and buttons 2…

1-19
1
Part names and functions
9. Power connection terminals
The power connection terminals are located inside the lower left panel on the rear of the machine.
Connect the power cable leads as shown below to the primary terminals L1, L2 and L3 on the main breaker
and the ground terminal on the main unit chassis.
n
Power supply specifications
Machine name Power Frequency Power capacity
YSD
3-phase AC
200 / 208/ 220 / 240 / 380 / 400 / 416V (±10%)
50/60Hz 7.0KVA
Power input terminal
Main breaker
Power input terminal
L1
L2
L3
PE
63118-N7-00
Ring-tongue crimp terminal
Fork-tongue crimp terminal
Power cable example
L1
L2
L3
PE
L=100mm
63119-N7-10
c
CAUTION
Use a power cable whose conductor cross section is 3.3 mm2 or more.
w
WARNING
TO AVOID THE RISK OF ELECTRICAL SHOCK, ENSURE THAT THE POWER SOURCE IS OFF BEFORE CONNECTING THE POWER
CABLE. ALSO MAKE SURE THAT THE GROUND CABLE IS SECURELY CONNECTED TO THE MACHINE.

Chapter 2 Basic operation
Contents
1. Before operation 2-1
1.1 Starting the machine 2-1
1.2 Canceling emergency stop 2-3
1.3 Clearing an error 2-4
1.4 Turning off the machine power 2-5
2. Operation screen and buttons 2-7
2.1 Basic configuration of operation screen 2-7
2.2 Setup screen 2-10
2.3 Unit screen 2-12
3. Machine operation from start to finish 2-16
3.1 Pre-operation check 2-17
3.2 Selecting the board data 2-18
3.3 Changing the conveyor unit setup 2-19
3.3.1 Conveyor unit setup flow 2-19
3.3.2 Changing the conveyor width 2-20
3.3.3 Adjusting the board hold plates 2-21
3.3.4 Arranging the push-up pins 2-22
3.4 Head unit setup 2-24
3.5 Starting and warming up the machine 2-27
3.6 Bleeding the nozzle air 2-29
3.7 Performing a dispensing test 2-32
3.8 Starting board production 2-34
3.9 Displaying the production monitors 2-35
3.10 Finishing board production 2-44
4. Basic tasks for optional units 2-46
4.1 Low-liquid sensor 2-46
4.1.1 Adjusting the low-liquid sensor 2-48
4.2 Dot station 2-50
4.2.1 Replacing the paper 2-50
4.3 Laser displacement meter 2-52
4.3.1 Initialization 2-52

2-1
2
Basic operation
1. Before operation
The following sections explain how to start and stop the machine and also how to cancel emergency stop
and clear an error. Read before operating the machine.
1.1 Starting the machine
Proceed as follows to start the machine.
1
Turn the main power ON.
Turn on the main power switch at the front lower right of the machine, by turning to the right. The
Initialization screen appears and the loading of the program necessary for machine operation starts.
ON
OFF
Main Switch
63202-N7-00
c
CAUTION
After turning the power switch off, wait at least 2 seconds before turning the power back on again.
Initialization screen
64202-N7-00
2
Perform return-to-origin.
After initialization, the return-to-origin dialog box appears. Follow the instructions on the screen.
To perform return-to-origin manually, press the [Origin] button on the Setup screen.