CM602all_EJM8AESM_Service Manual.pdf - 第61页
20 min . min. min. This section describes the procedures for changing voltage. ・ Tools ・ Jig Kgs 10 min. 10 2-1-1 Voltage Electric Source Installation Machine Installation Installation Phillips screwdriver #2 Tester None…

20
min
.
min. min.
This section describes the procedures for changing voltage.
・Tools
・Jig
Kgs
10 min. 10
2-1-1 Voltage Electric Source
Installation Machine Installation
Installation
Phillips screwdriver #2
Tester
None
Assembly/Adjustment
Teaching
R
emovable/Disassembl
y
Total Time Part Weight
2
Machine Installation
2-1
Dange
r
Warning
Caution
EJM8A-E-SMA020101-A01-00
Page 2-1-1-1

* Be sure to remove the short bar when there is a neutral line.
Otherwise, a short-circuit will occur.
Ex. Change from "With a neutral line"
to "Without a neutral line"
Tool/Spec./Installation
Tool/Spec./Installation
Change the connection of Cable Terminals L10, L20 and L30.
Change Transformer Tap TU1.
short bar from the terminal block (TB4).
To connect the power line when there is a neutral line (N line), remove the
Phillips screwdriver #2
Installation
Tool/Spec./Installation
Tool/Spec./Installation
Phillips screwdriver #2
Item Remarks
Machine Installation
2
Phillips screwdriver #2
Phillips screwdriver #2
1
U480
U420
U400
U380
U220
U200
V480
V420
V400
V380
V220
V200
W480
W420
W400
W380
W220
W200
L10 L20 L30
L10 = U***
L20 = V***
L30 = W***
Ex. When changing from 200V to 400V:
× ×
×
×
× ×
× ×
× ×
× ×
PE
N
L3
L2
L1
L1
× ×
PE
EJM8A-E-SMA020101-A01-00
Page 2-1-1-2