Maintenance 7-1 7 Maintenance 7.1 Overvi ew Perform ing the re comm ended m aintenanc e pro cedures on the Selec t Coat SL- 940E/SL- 941E Series Conformal Coating Sy stem at the interv als sug gested in thi s section inc…

100%1 / 208
6-22 Configuration and Characterization
13. Click Next.
The Wizard will now apply three stripes of material to the test area (See Figure 6-20).
Desired Start Desired End
2
nd
3 passes
1
st
3 passes
Figure 6-20 Material Characterization
14. You will be prompted to teach the coordinates of the test area.
a. Teach the stripe with the best starting accuracy and click
Next.
If none are exact but one stripe starts too soon and the next too late, teach between
the two stripes. The wizard interpolates the values of the two.
b. Teach the stripe with the best ending accuracy and click
Next.
If none are exact but one stripe ends too soon and the next too late, teach between the
two stripes. The wizard interpolates the values of the two.
15. Enter the stripe width and click
Next.
The wizard applies three more stripes to the test area.
16. Check the starting and ending points of the second three stripes. If they are not accurate,
rerun the characterization, making adjustments as necessary to obtain the best results.
17. The settings will be displayed for your approval.
TIP To perform a characterization from the ECXP Operator screen, click on Configure >
Tool > Toolname
. The Tool Configuration dialog box opens.
Maintenance 7-1
7 Maintenance
7.1 Overview
Performing the recommended maintenance procedures on the Select Coat SL-940E/SL-941E Series
Conformal Coating System at the intervals suggested in this section increases system life and ensures
high quality dispensing performance for every production run. This section covers the following topics:
Hazardous Materials
Cleaning the Fluid Filter
Record Keeping
Lubricating the Cables and Linear Guides
Routine Maintenance Procedures
Tensioning the Cables
Cleaning the Spill Pan
Tensioning the Conveyor Chains
Emptying the Water Trap
7.2 Safety First
Operation of the SL-940E/SL-941E involves heat, air pressure, electrical power, mechanical devices, and
the use of hazardous materials. It is essential that every person servicing or operating the coating system
fully understands all hazards, risks, and safety precautions. Refer to Section 2 - Safety for additional
information.
WARNING! CAUTION!
To ensure optimal performance and safety, it is necessary to install the coating
system in a facility that meets the necessary requirements listed in Section 10 -
Specifications. If you have any questions, please contact Asymtek Technical
Support.
7.3 Hazardous Materials
Some maintenance procedures involve the use of hazardous materials. Always follow all applicable
national and local statutes and regulations, facility safety practice, and the material manufacturer's MSDS
recommendations.
7.4 Record Keeping
The type of maintenance performed (such as preventive and parts replacement) should be recorded in
maintenance records for the coating system. Dates, part numbers/serial numbers of replaced parts, names
of technicians, and other pertinent data should be recorded.
WARNING! Allow only qualified personnel to perform the following tasks. Observe and follow
the safety instructions in this document and all other related documentation.
7-2 Maintenance
7.5 Routine Maintenance Procedures
WARNING! CAUTION!
Before performing any of the maintenance procedures in this section, perform a
service shutdown described in 5.11.2.4 Service Shutdown.
NOTE The following maintenance procedures are for the SL-940E/SL-941E Series Conformal
Coating Systems only. Refer to the appropriate manual for recommended maintenance
procedures for your specific coating applicator.
Routine maintenance procedures and required intervals are listed in Table 7-1. It is also recommended
that you follow all procedures listed in 5.12 Daily Routine Procedures.
Table 7-1 Routine Maintenance Procedures
Task Frequency Instructions
Clean Dispensing Area Daily
Remove spilled fluids with the manufacturer’s recommended
solvent and a soft cloth. Remove any foreign objects from the
dispensing area and ventilation holes.
NOTE Make sure the coating system ventilation is
ON during handling and cleanup of all
materials used with the coating system. DO
NOT cover ventilation holes.
Clean Spill Pan Daily
See 7.6 Cleaning the Spill Pan.
Clean Fluid Filter Weekly
Replace as necessary. Refer to 7.8 Cleaning the Fluid Filter.
Drain Water Trap Weekly
Check the water level in the water trap and empty if full. See
7.7 Emptying the Water Trap.
Check Conveyor Weekly
Check conveyor guards for alignment and security. Inspect
conveyor chains for proper tension.
Inspect Hardware Weekly
Inspect coating system for broken, loose, worn, or missing
hardware. Replace or repair as necessary.
Inspect Electrical And
Pneumatic Lines
Weekly
Inspect coating system for broken, loose, or frayed electrical
and pneumatic lines. Replace as necessary.
Check Air Cylinders Monthly Check for leakage.
Lubricate the Cables and
Linear Guides
Every three
months
See 7.10 Lubricating the Cables and Linear Guides.
Tension Mechanical Drive
Cables
Every 6-12
months
See 7.11 Tensioning the Cables.
Empty Purge Cups As Needed
Empty and clean purge cups. Follow MSDS
recommendations for the proper handling and disposal of all
materials.
Refill Solvent Cups As Needed Refill as needed.
Clean Camera Lens (if
applicable
As Needed Use the cleaning kit provided.
Tension Conveyor Chains As Needed
See 7.12 Tensioning the Conveyor Chains.
Replace Conveyor
Chains
As Needed
See 9.8 Replacing Conveyor Chains.