SL940-Install-Ops-Maintenance-7210918_B.pdf - 第204页
在线预览 SL940-Install-Ops-Maintenance-7210918_B.pdf PDF 文档。

Glossary G-5
Service Shutdown: When all dispensing is stopped and
the coating system is made safe so that servicing can be
performed.
Service Technician: Trained personnel responsible for
performing advanced system servicing procedures.
SMEMA: Surface Mount Equipment Manufacturers
Association. Established protocol for signal
communication between two or more different systems.
Stop Pin (SL-940E): The Stop Pin is a pneumatic
device used to stop workpieces as they are conveyed
into the system.
SVGA: Super Video Graphics Array. A video card that
produces high-quality color images at high resolution.
TFT: Thin Film Transistor. The Monitor component
that provides color images for a liquid crystal display.
Tool Offset: The tool offset is the X, Y, and Z distance
from the robot's lower tooling pin to the tool tip (the end
of the nozzle). Robot position is calculated using the
coordinates of the tooling pin plus the offset.
Tool: A tool generally consists of a coating applicator
and nozzle. It may also be a teach camera, or a laser
pointer for programming.
Tooling Rails (SL-941E): The adjustable Tooling Rails
secure the workpiece for batch system operation.
Upstream/Downstream SMEMA Sensors: Mounted
on a bracket attached to the conveyor rail, upstream and
downstream SMEMA sensors allow you to manually
load and unload workpieces onto the conveyor in the
absence of upstream or downstream systems.
UV-Cure: Curing method that uses ultra-violet light to
cure (harden) coating materials.
V: Abbreviation for volt as in VAC (Volts Alternating
Current). See also AC, DC.
Valve: See Coating Applicators.
Viscosity: Viscosity is a measurement of the flow
properties of a fluid. The ability of a fluid to resist
deformation under stress. High viscosity fluids have a
high resistance to flow, and low viscosity fluids have a
low resistance.
Water Trap: Moisture from the outside air can
condense in the pneumatic system. The Water Trap
collects this condensed moisture. The Water Trap must
be emptied when it’s full.
Workcell: Dispensing area.
Workpiece: The board or substrate (PCB, PWA, etc.) or
a carrier (pallet, auer boat, lead frame, etc.) to be
dispensed upon.
X-Axis: Left to right movement of the Dispensing Head
in the dispensing area (Workcell).
X-Beam: The apparatus that spans the width of the
dispensing chamber. The Dispensing Head is mounted
to the X-Beam and slides along it in the X-Axis.
Includes mechanical pulleys for the X-Axis cables.
Y-Axis: Forward and backward movement of the
Dispensing Head in the dispensing area (Workcell).
Z-Axis: Up and down movement of the Dispensing
Head in the dispensing area (Workcell).

Index I-1
Index
A
Adjustable Tooling Rails ............................................ 1-4
Air Pressure
adjusting conveyor air pressure ........................... 5-13
adjusting fluid air pressure ................................... 5-10
adjusting main air pressure .................................... 5-8
adjusting reservoir air pressure .............................. 5-9
Applicator ON/OFF Button ...................................... 1-12
B
Bar Code Scanner
configuration ........................................................ 6-18
testing .................................................................. 4-20
utilities ................................................................. 4-20
Bar Code/Data Matrix Reader .................................... 1-4
Board Pins ................................................................ 1-14
Board Present Sensor ................................................. 1-4
Board Sensor ............................................................ 1-14
Brush Box .................................................................. 1-4
C
Cables
tension reminder .................................................. 7-12
tensioning ................................................... 7-12–7-13
Camera
configuration .......................................................... 6-5
installation ........................................................... 3-10
states ...................................................................... 4-6
Characterization ....................................................... 6-18
Characterization Sheet .............................................. 6-20
Circulating Heated Fluid System ............................. 1-18
Coating Applicators........................................... 1-8, 1-13
SC-104HS/SC-105HS............................................ 1-8
SC-105VCS ........................................................... 1-8
SC-204HS/SC-205HS............................................ 1-8
SC-300 ................................................................... 1-9
SC-400 ................................................................... 1-9
Coating Area ............................................................ 1-11
Coating Process .......................................................... 5-4
Coating System
anchoring ............................................................. 3-10
configuration and characterization ......................... 6-1
detailed operation .................................................. 5-4
dispensing area .................................................... 1-11
facility requirements ............................................ 10-1
front panel ............................................................ 1-12
installation ............................................................. 3-1
levelers ................................................................. 1-11
leveling .................................................................. 3-6
lower front cabinet ...............................................
1-15
maintenance ..................................... See Maintenance
manuals supplied ................................................... 1-2
optional equipment ................................................ 1-4
safety ..................................................................... 2-1
shutdown.............................................................. 5-15
standard equipment ................................................ 1-3
startup ........................................................... 4-5, 5-14
system description ................................................. 1-1
system features .................................................... 1-10
testing .................................................................... 4-8
warranty ................................................................. 9-2
Computer .................................................................... 1-3
installation ............................................................. 3-9
Configuration
bar code scanner .................................................. 6-18
beacon .................................................................... 6-6
conveyor .............................................................. 6-13
fan width control .................................................... 6-9
fixture .................................................................. 6-10
inverter ................................................................. 6-15
reconfigure ............................................................. 6-2
robot ............................................................ 6-16, 6-17
setting fixture constraint location ........................ 6-10
tool ......................................................................... 6-8
Conformal Coating
characterization .................................................... 6-18
curing ..................................................................... 5-1
defined ................................................................... 5-1
Connecting the Power and Air Supply ....................... 4-3
Conveyor ........................................................... 1-3, 1-14
adjustments ............................................................ 5-3
chain ............................................................... 1-3, 5-3
chain replacement .................................................. 9-5
configuration ........................................................ 6-13
manual width adjustment ..................................... 1-14
tensioning chains ................................................. 7-14
testing .................................................................. 4-10
troubleshooting ...................................................... 8-3
utilities ................................................................. 4-18
Conveyor Air Regulator and Gauge ......................... 5-13
D
Daily Routine Procedures ......................................... 5-17
Database Utility ........................................................ 5-28
Dispensing Head ............................................. See Robot
Disposal
equipment .............................................................. 2-4
materials ................................................................ 2-4
Dual Toggle Mounting Bracket .................................. 1-5
Dual-Simultaneous Mounting Bracket ....................... 1-5
E
Earthquake Precautions .............................................. 2-5
Easy Coat for Windows XP............................. See ECXP
ECW.INI .................................................................... 6-2
ECXP .................................................................. 1-3, 5-2
bar code scanner utilities ..................................... 4-20
characterization wizard ........................................ 6-22
configuration .......................................................... 6-2