SL940-Install-Ops-Maintenance-7210918_B.pdf - 第154页
9-6 Parts Replace ment 5. Locate th e master link and use the pliers to rem ove it as des cribed b elow : a. Rem ove the reta ine r c lip ( Figur e 9-4). b. Rem ove the fem ale link ( Figur e 9-5). c. Remov e the master …

Parts Replacement 9-5
9.8 Replacing Conveyor Chains
Checking the condition of the conveyor chains should be part of the routine maintenance schedule for the
coating system. Worn or broken chains should be replaced immediately. Refer to Appendix C for a parts
list of conveyor components.
Tools and Materials Needed:
Pliers Phillips Head Screwdriver
3/32-inch Hex Key Removable Thread Locker (P/N 40-0019)
Isopropyl Alcohol Roller Chain, #25, NP (P/N 193721)
Soft Cloth and Cotton Swabs Master Link, #25 Chain (P/N 193722)
To replace the conveyor chains:
1. Perform a service shutdown as described in 5.11.2.4 Service Shutdown.
2. Move the dispensing head to the rear of the machine.
3. Use the manual width adjust to move the rear conveyor rail to achieve an approximate eight-
inch space between the front and rear conveyor rails.
4. Create slack in the chain by loosening the four mounting screws on the back of the motor
bracket and moving the bracket up and down until the desired slack is achieved (Figure 9-3).
Figure 9-3 Creating Slack in the Chain
Motor Bracket
Screws

9-6 Parts Replacement
5. Locate the master link and use the pliers to remove it as described below:
a. Remove the retainer clip (Figure 9-4).
b. Remove the female link (Figure 9-5).
c. Remove the master link (Figure 9-6).
Figure 9-4 Removing the
Retainer Clip
Figure 9-5 Removing the
Female Link
Figure 9-6 Removing the Master
Link (Male Link)
6. Remove any rail-mounted components that interfere with chain removal/replacement.
7. Remove the old chain by sliding it off the conveyor sprockets.
TIP It is recommended that you remove and replace one chain at a time to ensure that
all parts removed from each rail are re-installed in their exact same locations.
8. Use isopropyl alcohol and clean swabs to clean all metal surfaces that make contact with the
chain, including sprockets and rails.
9. Install the new chain onto the sprocket rail (Figure 9-7).
Figure 9-7 Installing the Chain on the Sprocket Rail

Parts Replacement 9-7
10. Bring the two ends of the chain one chain-link length apart (Figure 9-8).
11. Insert master link’s male link into both ends of the chain so that pins are pointing outboard
(Figure 9-8).
12. Attach the master link’s female link to both male link’s pins (Figure 9-9).
13. Slide the retainer clip onto male link’s pins. Ensure that the clip’s open end points in the
direction of the motor subassembly (Figure 9-10).
Figure 9-8 Inserting the Male
Link
Figure 9-9 Attaching the
Female Link
Figure 9-10 Installing the
Retainer Clip
14. Tension the chain by loosening the motor mounting screws allowing the motor’s weight to
remove the slack.
NOTE Slack should be eliminated with the motor’s weight (do not push the motor
down to create tension on the chain).
15. Perform a visual inspection of chain to ensure that slack from chain is eliminated.
16. Lock motor into position by tightening screws.
17. Perform a function check by revolving the chain 2 to 3 times through its complete range
of motion.
18. Replace any rail-mounted equipment that you removed in Step 6.
19. Repeat Steps 7-18 for the remaining chain.
20. Replace any coating system panels you may have removed.