SL940-Install-Ops-Maintenance-7210918_B.pdf - 第56页

3-6 Inst allat ion 3.5 Leveling the Coat ing S y stem WARNING ! CAUTI ON! This pr ocedure sho uld on l y be perf ormed b y a trained s ervice tec hnician . The system should b e shutdo wn for service b efore per form ing…

100%1 / 208
Installation 3-5
4. Remove the shipping bracket and warning tag attached to the Z-Head by loosening the
screws. See Figure 3-4.
Retain bracket and hardware for future shipping purposes.
Item Description
1 Allen Head Screws
Figure 3-4 Removing the Z-Head Bracket
1
3-6 Installation
3.5 Leveling the Coating System
WARNING! CAUTION!
This procedure should only be performed by a trained service technician. The
system should be shutdown for service before performing this procedure. Refer
to 5.11.2.4 Service Shutdown.
1. Place a box level on the conveyor rail along the X-axis (Figure 3-5).
2. Observe the position of the bubble within the level’s window.
The bubble should be centered, indicating the coating system is level from side-to-side.
Figure 3-5 Leveling the Coating System – X-Axis
3. If necessary, adjust the levelers (Figure 3-6) of the coating system as follows:
a. Loosen the 1 1/2-inch lock nut on the leveler if necessary.
b. Turn the 1 1/2-inch post nut in the desired direction until the level’s bubble is centered,
indicating that the system is level from side-to-side.
Turning the post nut clockwise raises the coating system. Turning the post nut
counterclockwise lowers the coating system.
Item Description
1 Lock Nut
2 Post Nut
3 Leveler
Figure 3-6 Coating System Levelers (Feet)
1
2
3
Installation 3-7
4. Place the box level between the front and rear conveyor rails along the Y-axis (Figure 3-7).
5. Observe the position of the bubble within the level’s window.
The bubble should be centered, indicating coating system is level from front-to-back.
Figure 3-7 Leveling the Coating System – Y-Axis
6. If necessary, adjust the levelers (Figure 3-6) of the coating system as follows:
a. If necessary, loosen the 1 1/2-inch lock nut on the leveler.
b. Turn the 1 1/2-inch post nut in the desired direction until the level’s bubble is centered,
indicating that the system is level from front-to-back.
Turning the post nut clockwise raises the coating system. Turning the post nut
counterclockwise lowers the coating system.
7. Check the system for stability by pressing up and down on one of the top corners of the
coating system. If one leveler is lower or higher than the others, the coating system will rock
back and forth. Adjust the levelers so that they are all bearing the weight equally.
8. Re-level the coating system from side-to-side and from front-to-back, if necessary.