编带机说明书-含图纸ttm402.pdf - 第145页
Cha pter 6: Operation Content s Quick St art: Running a J ob . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-2 Prep aring to Run a Pre-programmed Job . . . . . . . . . . . . . . . . . . . . . . …

5-46 TM-403 User’s Guide
Configure Inspection D292105.16c.fm
2. After the setting is completed, touch Complete, then touch Yes.

Chapter 6: Operation
Contents
Quick Start: Running a Job. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .6-2
Preparing to Run a Pre-programmed Job . . . . . . . . . . . . . . . . . . . . . . . .6-4
Power up the System. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-4
Home Motors . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-4
Setup the Bowl Feeder. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-6
Setup the Taper . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-7
Select Job . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-8
Setup the Pick Head . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-9
Setup Vision. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-10
Run the Job . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-11

6-2 TM-403 User’s Guide
Quick Start: Running a Job D292105.8b.fm
Quick Start: Running a Job
The following is an outline of the basic steps required to run a pre-programmed job. More
detailed instructions follow in the next section of this chapter.
Caution: Users should always wear protective eye wear when operat-
ing or maintaining the TM-402.
1. Power up.
• Power up the machine by turning on the Main Power Switch.
• Press the Reset button.
2. Home the motors.
• Open the Run Tab on the HMI and select Home Motors.
3. Setup Bowl Feeder.
• Ensure correct Linear Track is installed.
• Load components.
4. Setup Taper.
• Ensure sufficient carrier tape and cover tape are loaded to complete the job.
• Load an empty take-up reel.
• Run peel force test to verify seal.
5. Setup the Pick Head.
• Ensure the correct nozzle is installed for the part that will be picked.
• Observe the vacuum sensor, adjusting nozzle pressure as necessary.
• Adjust Blow-off Pressure as needed to achieve proper part placement.
• Close the enclosure doors.
6. Select Job.
• Open the Job Tab on the HMI. Select the desired job from the Job Library and
press Open to open the selected job in the Run Tab.
Quick
Start