编带机说明书-含图纸ttm402.pdf - 第152页
6-8 TM-403 User’s Guide Preparing to Ru n a Pre-programmed Job D292105.8b.fm Select J ob When a job is already set up and saved in the machine’ s memory , the first step in running the job is to call it up with the Job S…

D292105.8b.fm Preparing to Run a Pre-programmed Job
Chapter 6: Operation 6- 7
Setup the Taper
1. Load the correct carrier tape and cover
tape, adjusting the track width as
necessary.
2. Select PSA or Heat seal.
3. Align cover tape with carrier tape.
4. Run a pull test and adjust seal strength
as needed.
5. Place an empty reel onto the take-up
reel spindle.
6. Use the Continuous Advance button on the Taper Tab to run out the tape until it
can be attached to the reel.
The tape normally can be attached by inserting it into the reel hub or with blue
Permacel tape.
Step 4:
Setup
Ta p e r

6-8 TM-403 User’s Guide
Preparing to Run a Pre-programmed Job D292105.8b.fm
Select Job
When a job is already set up and saved in the machine’s memory, the first step in running
the job is to call it up with the Job Select screen.
1. On the HMI, select the Job Tab
2. Browse through the Job Library to locate the desired job by using the up and down
Arrow buttons.
3. Press the Enter button to select the job, then press Open to open the selected job
in the Run Tab..
Step 5:
Select
Job

D292105.8b.fm Preparing to Run a Pre-programmed Job
Chapter 6: Operation 6- 9
Setup the Pick Head
1. Ensure the correct Nozzle and Nozzle Tip are installed for the job that will be run.:
Note: See the Chapter 4: Setup for nozzle
change procedures.
2. Open the Head Tab on the HMI.
Step 6:
Setup
Pick Head