编带机说明书-含图纸ttm402.pdf - 第151页

D292105.8b.fm Preparing to Run a Pre-programmed Job Chapter 6: Operation 6- 7 Setup the T aper 1. Load the correct carrier t ape and cover tape, adjusting t he track width as necessary . 2. Select PSA or Heat seal. 3. Al…

100%1 / 298
6-6 TM-403 User’s Guide
Preparing to Run a Pre-programmed Job D292105.8b.fm
Setup the Bowl Feeder
1. On the HMI, select Bowl from the tab menu on the left to open the Bowl Setup
Tab.
2. Ensure the correct track size is installed for the part which will be run.
3. Load parts into the Bowl Feeder.
4. In the HMI Bowl Settings Tab, turn the Linear Vibratory to Enabled. The Linear
Track will turn on and activate the Bowl and Hopper, feeding parts into the Bowl.
5. Manually adjust the Vibratory Controls on the Bowl Assembly for Linear Track
and Bowl as needed to suit the type of component that is being processed.
Step 3:
Setup
Bowl Feeder
D292105.8b.fm Preparing to Run a Pre-programmed Job
Chapter 6: Operation 6- 7
Setup the Taper
1. Load the correct carrier tape and cover
tape, adjusting the track width as
necessary.
2. Select PSA or Heat seal.
3. Align cover tape with carrier tape.
4. Run a pull test and adjust seal strength
as needed.
5. Place an empty reel onto the take-up
reel spindle.
6. Use the Continuous Advance button on the Taper Tab to run out the tape until it
can be attached to the reel.
The tape normally can be attached by inserting it into the reel hub or with blue
Permacel tape.
Step 4:
Setup
Ta p e r
6-8 TM-403 User’s Guide
Preparing to Run a Pre-programmed Job D292105.8b.fm
Select Job
When a job is already set up and saved in the machine’s memory, the first step in running
the job is to call it up with the Job Select screen.
1. On the HMI, select the Job Tab
2. Browse through the Job Library to locate the desired job by using the up and down
Arrow buttons.
3. Press the Enter button to select the job, then press Open to open the selected job
in the Run Tab..
Step 5:
Select
Job