CP45-英文版培训教材.pdf - 第155页

1.1.1.2 Aged and Worn Part Replacement Large Group Head & ANC PCB Feeder Air Pressure Cooling FAN Small Group Compliance V-Ring Filter Nozzle Belt Filter & Drainer Filter (Outer Fan) Content to be checke d Check …

100%1 / 208
Large
Group
Cooling Fan Others Electric Device
Small
Group
Outer
Fan
PC Fan
Filter
(Outer
Fan)
Mouse Keyboard Lamp
Teaching
Box
Monitor
Isolation
Switch
Current
Breaker
Current
Protect
Emergency
Switch
Door
Switch
Relay Fuse
Content
stobe
checked
Operatin
g
condition,
Noise
Operatin
g
condition,
Noise
Contam
ination,
Clogge
d
Operating Condition
Monitor
Condition
(Discolore
d,
Obscure,T
wisted)
Operating Condition, Worn Condition
Inspection
Interval
Weekly(W) Monthly(M) Monthly(M) Weekly(W) Monthly(M)
Reference
Remarks
Contact C/S when
abnormal conditions occur.
Contact C/S when operating
conditions are improper.
Contact
C/S when
abnormal
conditions
occur.
Contact C/S when abnormal conditions occur.
Check
Point
Table 11. Daily Inspection List
1.1.1.2 Aged and Worn Part Replacement
Large
Group
Head & ANC
PCB
Feeder
Air Pressure
Cooling
FAN
Small
Group
Compliance V-Ring Filter Nozzle Belt
Filter &
Drainer
Filter
(Outer Fan)
Content
to be
checke
d
Check
together
daily
inspection
Check together
daily
inspection
Check
together daily
inspection
Check together
daily
inspection
Check
together daily
inspection
Check
together daily
inspection
Inspection
Interval
Weekly(W) Monthly(M) Daily(D) Monthly(M) Monthly(M) Weekly(W)
Replacement
Interval
Every 3
years
Every 3 years
Every 6
months
Every 2 years Every 3 years Every 1 year
Every 6
months
Remarks
Contact C/S
when
replacing the
part.
Contact C/S
when
replacing the
part.
Contact C/S
when replacing
the part.
Contact C/S
when
replacing the
part.
Contact C/S
when
replacing the
part.
Contact C/S
when
replacing the
part.
Contact C/S
when
replacing the
part.
Check
Point
-> Memo
Part Inspection &
Replacement Interval Setting
This shall be applied in
accordance with the specified
operating environment
conditions.
If the operating conditions are
deteriorated, the interval of part
inspection and replacement can
be reduced.
Table 12. Replacement Interval List
Operating Manual Reference Figure
CP-45/55 Operation Process
# GREASE Specification
@System : Lithium Soap, High Load
(Industrial Use), Lithium Complex,
Non-leaded
@Consistency : 265-295 (NLGI 2Class),
@Operating Temperature :
-15 / +150
o
C(Dropping Point 255
o
C)
@Purchasing & Contact : KiHEUNG
Co., Ltd.
(KANTO KASEI Branch located in
Busan (T.82-51-808-3549))
Purchasable in 15kg Unit
# Application Method
Apply or lubricate the grease 1 time
every 100km of running distance.
@1 time lubrication and application
every 1~2 weeks
(Operating Condition for 24 hours a
day)
@1 time lubrication and application
a month.
(Operating Condition for 10 hours
aday)
Large
Group
Small Group Lubrication Type
Lubrication
Method
Lubricatio
n Interval
Head
L/M Guide RE-Lubrication SET MNW Lubricating 4Months
Ball Spline
ALVANIA EP GREASE 2
(SHELL)
Applying 3Months
X-axis
L/M Guide Grease(EP2) Applying 1Month
Ball Screw Grease(EP2) Applying 1Month
Y-axis
L/M Guide
Grease(EP2) Lubricating 3Months
Grease(EP2) Applying 1Month
Ball Screw
Grease(EP2) Lubricating 3Months
Grease(EP2) Applying 1Month
PCB
Feeder
Lead Screw Grease(EP2) Applying 2Months
L/M Guide Rail Grease(EP2) Applying 6Months
Grease(EP2): Lithium Soap Grease No.2
1.1.2 General Lubrication