CP45-英文版培训教材.pdf - 第63页
Operating Manual MODEL Reference Figure CP-45/55 Operation Process V TR Register Click the <New Part… > button on the left of the bottom of a screen. ^ Create the Part Name. (TR23) ^ Select the Group to TR. ^ Enter…

Operating Manual
MODEL
Reference Figure
CP-45/55 Operation Process
^ Create the Part Name.
Chipr1608-0.4t)
^ Set Group to Chip Resistor 1608.
^ Enter the Part Size.
Align Data - X: 1.6, Y: 0.8
Enter the thickness of Part Data.
At this time, X and Y values read
automatically the Align Data.
^
Enter the Common Data by
pressing <Common Data> button.
^ Select 8mm Tape on <Feeder>
Combo box.
^ Select TN05 and TN08 on
<Nozzle 1> and <Nozzle 2>
Combo Box separately.
Register the part by clicking the
<Register> button.

Operating Manual
MODEL
Reference Figure
CP-45/55 Operation Process
V
TR Register
Click the <New Part…> button
on the left of the bottom of a
screen.
^ Create the Part Name. (TR23)
^ Select the Group to TR.
^ Enter the Part Size.
Align Data Total X: 2.5, Y: 2.8
Up Group Input:
Up Lead Number 1
Foot W: 0.5
Foot L: 0.5
Foot P: 0.0
Down Group Input:
Down Lead Number 2
Foot W: 0.5
Foot L: 0.5
Foot P: 1.8
Enter the thickness of Part Data.

Operating Manual
MODEL
Reference Figure
CP-45/55 Operation Process
^
Enter the Common Data by
pressing the <Common Data>
button.
^ Select 8mm Tape on <Feeder>
Combo Box.
^ Select TN08 and TN08 on
<Nozzle 1> and <Nozzle 2>
Combo Box separately.
Register the part by clicking the
<Register> button.