CP45-英文版培训教材.pdf - 第188页

Operating Manual Reference Figure CP-45/55 Operation Process 2. Tape Installation 2.1 Tape I nstallation 2.1.1 Tape Guide Disassembly (2). Tape Guide (1). Locker ->Disassemble the locker by matching the n umber and or…

100%1 / 208
Operating Manual Reference Figure
CP-45/55 Operation Process
2. Tape Installation
2.1 Tape Installation
2.1.1 Tape Guide Disassembly
(2). Tape Guide
(1). Locker
->Disassemble the locker by matching
the number and order with the arrow
direction, and raise the tape guide.
2.1.2 Back Up Guide Fixing
->Press the back up guide by matching
with the arrow direction and order and
push it toward B direction to fix it.
Tape Guide
sprocket
Back up guide
Operating Manual Reference Figure
CP-45/55 Operation Process
2.1.3 Separation of Upper Cover
Tape(Vinyl) from Feed Tape
-> Separate the upper cover tape(vinyl)
from the feed tape and install that to
the feeder as shown in Fig. 2.1.3.
Tape guide Tape Separating
Slot
Upper Cover Tape
Feed Tape
2.1.4 Attaching Feed Tape to
Sprocket
-> Insert the sprocket hole in feed
tape into a sprocket, close the tape
guide and lock it with locker as shown
in Fig. 2.1.4.
The shapes of some feeders are
different each other, but apply the
same method to all tape feeders
regardless of the shapes.
Tape guide
Back up guide
Feed Tape
Locker
sprocket