CP45-英文版培训教材.pdf - 第86页

Operating Manual MODEL Reference Figure CP-45/55 Operation Process 3. Production Now we will download the PCB file created previously for production. Click <Production> button on the top of screen. v PCB Edit Finis…

100%1 / 208
Operating Manual
MODEL
Reference Figure
CP-45/55 Operation Process
V
Cycle Test: Click the left button.
V
Check inputted contents for
wrong contents, and identify
the Cycle.
V
Save: Enter the File Name and
save it. (Array.pcb)
ANC Setting
When placing a nozzle on ANC,
be sure to standardize and use it
as follows. Also, apply the same
placing method as the actual
type. Failing to observe this may
cause an error. If you change
ANC Data frequently, you may
modify the Data based upon PCB.
Operating Manual
MODEL
Reference Figure
CP-45/55 Operation Process
3. Production
Now we will download the PCB file
created previously for production.
Click <Production> button on the top of
screen.
v PCB Edit Finish
Finish the PCB Edit by clicking
<Finish> button.
v PCB File Down Loading
Download the PCB File which has
been finished on the device by
clicking <PCB D/L> button.
"Download ALL O.K" will be shown
on the bottom of a screen if no
problems occur to PCB File Data.
Click <Detail…> button on
<Production> dialogue box for more
information.
v Start
If no problems occur to
downloading and other PCB Data,
finish preparations of materials and
other works, and start production
by clicking <Start> button.
PART REGISTER
CP-45/55 Operation Process