SiplaceX4_en.pdf - 第553页
1 - 10 S tudent Guide SIPLACE X 12 Siplace X - Head M odularity Edition 09/2005 10 12.2 Head modularity C&P Head to T win Head Fig. 12.2 - 1 Flowchart Head excange C&P to T win Head 1. Data b ac k up Machine conf…

1 - 9
Student Guide SIPLACE X
Edition 09/2005 12 Siplace X - Head Modularity
9
Fig. 12.1 - 6 Menu "Head exchange" --> "Functions
(1) Head reference run to check the function and for calibration reference run the whole machine.
(2) Link to calibrate head and cameras.
(3) Mapping menu
(4) Display mapping data
(5) Link to machine data
12.1.4 Calibration
Please Note:
See Chapter Sitest "Calibration".
Siplace X C&P head 12
➠ Calibrate MA zero point.
➠ Calibrate PCB camera
➠ Calibrate C&P head
➠ Component camera
➠ Segment offset 2
➠ Segment offset 1
➠ Calibrate nozzlechanger (inclusive automatic pick up height)
4
1
2
3
5

1 - 10
Student Guide SIPLACE X
12 Siplace X - Head Modularity Edition 09/2005
10
12.2 Head modularity C&P Head to Twin Head
Fig. 12.2 - 1 Flowchart Head excange C&P to Twin Head
1. Data backup
Machine configuration
2. Remove C&P head with head
adapter.
3. Remove nozzle changer for
C&P head.
4. Mount stationary IC and/or FC-
camera.
Note: Twin head not possible in placement areas with
two gantries.
Exchange the docking unit to mount the stat. cameras
5. Mount Twin head with head
adapter.
6. Mount nozzle changer Twin
head.
Note: Check the DIP -Switches. Change the grub
screws into the correct position.
9. Calibrate Twin head and
cameras. (Mapping)
10. Change the machine
configuration in Siplace Pro.
8. Check the Twin head
specific data and make a
Firmware download.
Note: Sitest „Head type“ Read data from the head
Eprom and check the machine data.
7. Mounting the servo boards for
the Twin head (Axisunit) and
switch the Hotlink-cable for the
cameras (Computer unit).
Note: SITEST Machine configuration
Confirm the configuration, shutdown and switch
off the machine

1 - 11
Student Guide SIPLACE X
Edition 09/2005 12 Siplace X - Head Modularity
11
12.3 Head modularity Twin Head to C&P Head
Fig. 12.3 - 1 Flowchart Head exchange Twin head to C&P
1. Data backup
Machine configuration
2. Remove Twin head with head
adapter.
3. Remove nozzle changer for
Twin head.
4. Remove the stationary IC and/
or FC- camera.
Note: Remove the camera "HEADCRASH".
For exchange the stat. Cameras you have to
disassembly the docking unit.
5. Mount C&P head with head
adapter.
6. Mount the nozzle changer C&P
head.
Note: Check the DIP -Switches.
Note: Depend on the head pressure air supply
2,5 bar C&P6/12 or 4,5 bar C&P20.
Assembly docking unit for X-Feeder if C&P20
9. Calibrate C&P head and
cameras (Mapping).
8. Check the C&P head
specific data and make a
Firmware download.
Note: Sitest „Head type“ Read data from the
head Eprom and check the machine data.
7. Mounting the servo boards for
the C&P head (Axisunit) and
switch the Hotlink-cable for the
cameras (Computer unit).
10. Change the machine
configuration in Siplace Pro.
Note: SITEST Machine configuration
Confirm the configuration, shutdown and switch
off the machine