1 - 4 S tudent Guide Siplace X Course Contents Edition 09/2005 4 Tw i n H e a d : – General overview – Demonstration and explan ation of the head reference run – Pick up and placement cycle on the twin head – S tructure …

1 - 3
Student Guide SIPLACE X
Edition 09/2005 Course Contents
3
Siplace Axis Tester:
– Check and control of the dynamics with the SAT Box.
– Download to the SAT-Box
Gantry
– General setup and functionality of the gantry
– Demonstration and explanation of the gantry reference run
– Spare part replacement and adjustment work at the gantry axis
– Axis controlling and positioning of the gantry axis
– Control of the track signals with the Track signal tester
6/12 Collect & Place Head:
– General overview
– Demonstration and explanation of the head reference run
– Pick up and placement cycle on the 6 nozzle / 12 nozzle C&P head
– Spare parts replacement and adjustments at the C&P head
– Axis controlling and positioning of the C&P head axis
– Vacuum system
– LED function on head boards
– Control of the track signals
20 Collect & Place Head:
– General overview
– Demonstration and explanation of the head reference run
– Pick up and placement cycle on the 20 nozzle C&P head
– Spare parts replacement and adjustments at the C&P head
– Axis controlling and positioning of the C&P head axis
– Vacuum system
– LED function on head boards
– Control of the track signals

1 - 4
Student Guide Siplace X
Course Contents Edition 09/2005
4
Twin Head:
– General overview
– Demonstration and explanation of the head reference run
– Pick up and placement cycle on the twin head
– Structure and functionality of the head
– Exchanging the twin head
– Spare parts replacement and adjustments at the twin head
– Axis controlling and positioning of the twin head axis
– Vacuum system
– Control of the track signals
Calibration:
– Components of the User Interface
– Overview of the machine calibration
– Zero Point Corrections on the C&P and P&P heads
– Carry out the Calibration with single calibration menus and complete machine calibration
– Control of the track signals
Pneumatic Tape cutter (Docking unit):
– General information
– Preparation and removal of the Tape cutter
– Cutter blade and spare part exchange on the tape cutter
– Reinstallation of the tape cutter
– Functional check in the machine
Transport system:
– General Information and technical data about single and dual conveyor
– Mechanical structure and functionality of the conveyor
– Configuration flexible dual conveyor
– Electrically structure and communication to the machine via the transport control board
– Spare part replacement and adjustment work at the conveyor
– Calibrate and adjustments of the conveyor
– Configuration of the flexible conveyor

1 - 5
Student Guide SIPLACE X
Edition 09/2005 Course Contents
5
Head modularity:
– Reasons for and sequence of the head exchange
– Exchange the placement head with component camera
– Exchange of the nozzle changer
– Configuration at SIPLACE Pro and in SITEST
– Zero point corrections
– Calibration of the "new machine"
– Run 1st placement program
Component handling:
– Handling of the S- and X-Feeder and component tables
– Removing the component table
– Mechanical construction and functionality
– Adjustments on the component table
– Remount and test component table
Matrix Tray Changer 2:
– General Information
– MTC 2 specific safety instruction
– Parts overview of the machine (terminology)
– Adjustment the basic level and adjustment of the MTC into the machine
– Preparation, removal and installation of MTC
– Communication between Siplace X and MTC 2
– Placement function MTC 2
– Single function MTC 2
– Reference Run of the MTC 2
– Calibration and adjustment of positions on the feed and lift axis
– Download to the Masterdrives
– Machine data
Installation:
– Setting up and leveling a SIPLACE X
– Installation of the operating system and the stationsoftware