4 Setting up and commissioning User Manual SIPLACE D1/D2 4.5 Adapting the used tape channel From software version SR.605.xx 07/2008 EN Edition 228 → Secure the machine to prevent i t being swit ched on again , as describ…

100%1 / 334
User Manual SIPLACE D1/D2 4 Setting up and commissioning
From software version SR.605.xx 07/2008 EN Edition 4.5 Adapting the used tape channel
227
4.5 Adapting the used tape channel
If feeder modules that process component tapes with a pocket height > 17 mm are used, such as,
for example, the 44 mm S DP feeder module, then the separating plate (item 1 in Fig. 4.5 - 1
) must
be removed.
4
Fig. 4.5 - 1 Used tape channel with component reject bin
(1) Separating plate for tapes > 17 mm, removable
(2) DIN 84 - M3x6 screw, 2x
4
4
4.5.1 Safety instructions
WARNING 4
Switch the machine off at the main switch to remove the dividing plate.
Disconnect the machine from the power and compressed air supply.
4 Setting up and commissioning User Manual SIPLACE D1/D2
4.5 Adapting the used tape channel From software version SR.605.xx 07/2008 EN Edition
228
Secure the machine to prevent it being switched on again, as described in Section 2.10, page
90
.
Wait until the operating pressure for the tape cutter has dropped to 0 MPa.
Wear robust protective gloves.
Do not reach inside the used tape channel.
4.5.2 Removing the separating plate
Loosen the two slotted screws (item 2 in Fig. 4.5 - 1, page 227)
Pull out the separating plate (item 1 in Fig. 4.5 - 1
, page 227).
User Manual SIPLACE D1/D2 4 Setting up and commissioning
From software version SR.605.xx 07/2008 EN Edition 4.6 Commissioning the machine
229
4.6 Commissioning the machine
4.6.1 Commissioning the machine at the customer's premises
Check all modules for correct seating.
Wipe off the linear guide rails with a lint-free cloth before removing the shipping braces for the
X/Y axis. Do not use any solvent to do this (see Section 4.3.11
, page 215.
Switch on the machine and perform a reference run.
Copy the placement program onto the computer and test it.
Check the machine zero point after a period of warming up of 3 - 4 h.
Get the customer's operating personnel to equip the feeder modules according to the cus-
tomer's placement program.
Instruct them in handling the feeder modules using the JobGuide.
Check all customer-specific installed options (in particular software) for good functioning and
order any necessary spare parts using the order form or by fax.
4.6.2 Instructing the customer's personnel
Explain all customer-specific installed options, in particular software / software compatibility.
Explain programming of the program editors on the line computer / SIPLACE Pro.
Instruct the operators and line engineers in using the station software.
Explain about password protection.
Instruct the customer personnel in preventive maintenance and care on the basis of the Job-
Guide.
4.6.3 A test run or starting production
Test the line using the test PCB or a PCB provided by the customer.
Record the customer product and performance data, prepare the data and document the data
in the installation report.
Secure the data and give the customer security copies.