XP Type II 工程师培训手册 (2.0).pdf.pdf - 第210页

FK-9F98-34 XP Series T ype II T raining T ext for Service Engineers Edition 2.0 XP242E – Chapter 8 T ype II MTU Adjustment Page 17 of 18 8.24 Final Check 1. Confirm that bypass keys, jigs, wrenches, and ot her foreign ob…

100%1 / 248
FK-9F98-34 XP Series Type II Training Text for Service Engineers
Edition 2.0 XP242E – Chapter 8 Type II MTU Adjustment Page 16 of 18
5. Manually move the X, Y and Z axes until the nozzle jig can slide smoothly into the tray
pick up position jig hole:
6. Select [Maintenance C] – [Proper Data Editor] – [Machine Origin] –
[X_stage2Org/Y_stage2Org] – [Direct Servo Input] to save the current X and Y-axes
positions in proper data.
7. To set the [Z_stage2surface] proper data remove the tray jig (Z9531DEPJ3522). Set a
standard tray pallet in slot [01,02] and select [Manual Operation] – [Tray Operation] –
[01,02] – [Move Elevator] to bring the tray pallet to the tray origin position.
8. Select [Advance Shuttle] to bring the tray pallet to the tray pickup position.
9. Replace the pickup position nozzle jig (Z9731DEPJ3650) with the standard nozzle jig
(Z9531DEPJ0070).
10. Bring the placing head over the tray pallet and then press the emergency stop button to
cut the 200V power supply to the servos.
11. Manually descend the Z-axis until the nozzle jig just contacts the surface of the tray
pallet.
12. Select [Maintenance C] – [Proper Data Editor] – [Machine Origin] – [Z_stage2surface] –
[Direct Servo Input] to save the current Z-axis position in proper data.
8.22 Returning Proper Data
1. Select [Maintenance C] – [Proper Data Editor] – [Operation] – [TrayDetectMotion] and
change from 0 to 2.
2. Select [OPERATION_2] – [JogInterlockOFF] and change from 1 to 0.
8.23 Re-Tightening Check
1. Carry out a re-tightening check for any bolts that were tightened during the adjustment.
Fuji Machine Mfg. Co., Ltd. Okazaki
SMT Equipment Quality Assurance Dept.
8 – 16 CS Section
FK-9F98-34 XP Series Type II Training Text for Service Engineers
Edition 2.0 XP242E – Chapter 8 Type II MTU Adjustment Page 17 of 18
8.24 Final Check
1. Confirm that bypass keys, jigs, wrenches, and other foreign objects do not remain in the
machine.
8.25 Backing Up
1. Back up the system files at [Maintenance B] – [Backup].
Fuji Machine Mfg. Co., Ltd. Okazaki
SMT Equipment Quality Assurance Dept.
8 – 17 CS Section
FK-9F98-34 XP Series Type II Training Text for Service Engineers
Edition 2.0 XP242E – Chapter 8 Type II MTU Adjustment Page 18 of 18
NOTES:
Fuji Machine Mfg. Co., Ltd. Okazaki
SMT Equipment Quality Assurance Dept.
8 – 18 CS Section