XP Type II 工程师培训手册 (2.0).pdf.pdf - 第89页

FK-9F98-34 XP T ype II Series T raining T ext for Service Engineers Edition 2.0 XP142E – Chapter 6 Proper Dat a Measurement s Page 30 of 30 NOTES: Fuji Machine Mfg. Co., Ltd. Okazaki SMT Equipment Quality Assurance Dept.…

100%1 / 248
FK-9F98-34 XP Type II Series Training Text for Service Engineers
Edition 2.0 XP142E – Chapter 6 Proper Data Measurements Page 29 of 30
12. Set the conveyor width to minimum, then select [Manual Operation] – [Conveyor Width
adjustment] – [Measure Speed] – [START]. After the calibration is complete press [YES]
to save the results in proper data (ConvWidthMtrSpeed).
13. Once speed measurement is complete input a board width and select [Move] – [START].
The conveyor automatically moves to this board width.
14. Select a board with the same width as that input in step 13 and place it in the conveyor.
The board should fit smoothly into the conveyor, and there should be a clearance of
0.5mm between the conveyor and board. If not it is necessary to measure an offset.
15. Use the conveyor width changer inching tabs to change the conveyor width until the
clearance between board and conveyor is 0.5mm then select [Measure Offset] –
[START]. After the calibration is complete press [YES] to save the results in proper data
(ConvWidthOffset).
Fuji Machine Mfg. Co., Ltd. Okazaki
SMT Equipment Quality Assurance Dept.
6 – 29 CS Section
FK-9F98-34 XP Type II Series Training Text for Service Engineers
Edition 2.0 XP142E – Chapter 6 Proper Data Measurements Page 30 of 30
NOTES:
Fuji Machine Mfg. Co., Ltd. Okazaki
SMT Equipment Quality Assurance Dept.
6 – 30 CS Section
C
C
h
h
a
a
p
p
t
t
e
e
r
r
7
7
O
O
p
p
e
e
r
r
a
a
t
t
i
i
o
o
n
n
a
a
n
n
d
d
A
A
c
c
c
c
u
u
r
r
a
a
c
c
y
y