YRM20_Ope_E.pdf - 第189页

1. Flow from starting up machine to production 3-9 Chapter 3 Flow from starting up machine to production 1.5 Selecting the boar d data Select the board data used for production from those registered. 1 Call up the “Board…

100%1 / 220
1. Flow from starting up machine to production
3-8
Chapter 3 Flow from starting up machine to production
3
Start warming up the machine.
Press the [Start] button to start warm-up. The elapsed warm-up progress time and status appear in the
"Progress status" column.
c
CAUTION
If an abnormality occurs during warm-up, press the [Stop] button to stop operation immediately, check the cause of the
problem and eliminate it.
Warm-up time setting 2
Indicates progress.
[Start] button
[Stop] button
24304-KMX-00
4
Finish the warm-up.
Warm-up will automatically stop when the warm-up time you set is reached. Press the [Close] button,
and return to the previous screen.
1. Flow from starting up machine to production
3-9
Chapter 3 Flow from starting up machine to production
1.5 Selecting the board data
Select the board data used for production from those registered.
1
Call up the “Board Data Select screen.
Press the [Board] button on the “Setup” screen to call up the “Board Data Select” screen.
2
Select the board data.
Select the board data used for the production from the list on the “Board Data Select” screen. Press
the [Select] button. The machine reads out the selected board data.
Selecting the board data
[Setup] screen
Press [Board] button.
Selected from registered board data list.
“Board data select” screen
Selected board name is displayed. [Select] button
24305-KMX-00
1. Flow from starting up machine to production
3-10
Chapter 3 Flow from starting up machine to production
1.6 Conveyor unit setup
Set up (Get ready) the conveyor unit according to the selected board data.
The following 3 tasks for setting up the conveyor unit are required– “Push-up pin layout”, “Adjusting board
hold plate position” and “Checking state of clamping board”.
Board clamping method
Normally, the machine follows the “Edge clamp” method to clamp a board. The procedure is as follows.
1. The board transferred on conveyor stops at the mounting position when it comes into contact with the
main stopper.
2. The clamp board assembly pushes up the edge of the board so that the board is secured in place
between the clamp board assembly and the board hold plate.
3. Other than the edge of the board, the push-up pins support the board from under.
Board clamping
method
Board clamping method
C. Push-up pins
A. Push-up plate
B. Clamp board assembly
Main stopper
Figure of clamped board
D. Board hold plate
Board
BB
DD
C
A
Figure of clamped board (side view)
24306-KMX-00
c
CAUTION
If the board to be processed has a slit or the like, some of the conveyor sensors might not be able to detect the board. In
such a case, changing the machine settings and adjusting the sensor positions might be required. Before starting the actual
production, make absolutely sure that the boards are transferred correctly as intended.
n
NOTE
This machine follows the “Edge clamp” method to clamp a board. If using other method to clamp the board, the machine
may need to be modified or evaluated.