YRM20_Ope_E.pdf - 第25页

General Contents 4. Preparing component tape 2-47 4.1 T ape feeders 2-47 4.1.1 Setting component tape on the feeder 2-47 4.1.2 Setting feeders on the feeder exchange carriage 2-57 4.1.3 Attaching the feeder exchange carr…

100%1 / 220
General Contents
5. Conveyor 1-53
5.1
Conveyor unit 1-53
5.2 Sensor layout of conveyor unit 1-55
5.3 Board position in machine by board size 1-57
6. Recognition unit 1-58
6.1 Fiducial, Scan and Side-view camera 1-58
6.2 Side-view function (Scan camera / Side-view camera) 1-60
6.3 Multi-view cameras 1-61
7. Axis configuration 1-62
7.1 Head unit axis configuration 1-62
7.1.1 RM head unit 1-62
7.1.2 HM head unit 1-63
7.2 Main axis and conveyor axis configuration 1-64
Chapter 2 Basic operation
1. Before operation 2-1
1.1 Canceling emergency stop 2-1
1.2 Clearing an error 2-2
1.3 Typical errors and troubleshooting 2-3
1.4 Switching the display language 2-8
2. Operation screen and buttons 2-10
2.1 Basic configuration of operation screen 2-10
2.2 Setup screen 2-15
2.3 Unit screen 2-17
3. Displaying the production monitors 2-25
3.1 Production 2-25
3.2 Main 2-27
3.3 Vision 2-29
3.4 Alignment 2-32
3.5 Retry 2-33
3.6 Fiducial 2-34
3.7 Badmark 2-35
3.8 Pick Pos. (Pickup position offset) 2-36
3.9 Pick Rate Warning 2-38
3.10 Schedule task 2-42
3.11 Nozzle health check 2-44
3.12 Gap of pick-up position 2-46
General Contents
4. Preparing component tape 2-47
4.1 Tape feeders 2-47
4.1.1 Setting component tape on the feeder 2-47
4.1.2 Setting feeders on the feeder exchange carriage 2-57
4.1.3 Attaching the feeder exchange carriage on the mounter 2-61
4.1.4 Setting board data of component tape 2-64
4.1.5 Disposing of used cover tape and carrier tape 2-66
4.1.6 Detaching the feeder exchange carriage 2-69
4.1.7 Detaching feeder from the feeder exchange carriage 2-71
4.1.8 Detaching component tape from feeder 2-72
4.2 SS Feeder 2-75
4.2.1 Setting SS feeder on the feeder exchange carriage 2-76
4.2.2 Attaching the feeder exchange carriage on the mounter 2-78
4.2.3 Detaching the feeder exchange carriage from mounter 2-80
4.2.4 Detaching SS feeder from carriage 2-82
Chapter 3 Flow from starting up machine to production
1.
Flow from starting up machine to production 3-1
1.1 Pre-operation check 3-2
1.2 Starting the machine 3-3
1.3 Selecting the operator 3-5
1.4 Warming up the machine 3-7
1.5 Selecting the board data 3-9
1.6 Conveyor unit setup 3-10
1.6.1 Laying out push-up pins 3-11
1.6.2 Adjusting board hold plate position 3-15
1.6.3 Checking condition of clamping board 3-19
1.7 Preparing component tape (Tape feeder) 3-21
1.8 Confirming nozzles 3-22
1.9 Starting production 3-26
1.10 Ending production 3-27
1.11 Powering off the machine 3-28
1.12 Resuming operation from the stopped point 3-30
Appendix
A1. Specifications A-1
A2. YAMAHA Service website for user A-2
Index
The instruction manual of this machine is written for those who operate
this machine.
Please read this manual carefully for correct operations and pay special
attention to safety precautions.
After reading through this manual, please use this manual as an
occasional reference and keep it within reach.
About this manual
Contents
1. Using this manual i
1.1 Contents of each chapter ii
1.2 Page layout iii