YSP_Users_E.pdf - 第84页

3-4 3 Daily operation 3. Selecting the board data T o star t board production, first select the board data from the list of board data already created beforehand. 1 Select the board data. 1. When the board data is not ye…

100%1 / 278
3-3
3
Daily operation
4
Press the [Start] button to start warm-up.
The warm-up progress time and status will appear in the Warm-up dialog box.
Warm-up screen
Warm-up elapsed time
Pressing this button will stop the
warm-up operation.
64303-L3-00
c
CAUTION
If problem occurs during warm-up, press the [Stop] button to stop operation immediately, check the cause of the
problem and eliminate it.
5
End the warm-up.
Warm-up will automatically stop when the time you set is reached. Press the [Close] button, and return
to the previous screen.
3-4
3
Daily operation
3. Selecting the board data
To start board production, first select the board data from the list of board data already created beforehand.
1
Select the board data.
1. When the board data is not yet selected, press the [Board] button on the Setup screen.
A list of board data appears.
2. Line up the cursor with the board data to be produced and press the [OK] button.
The machine loads the selected board data.
[Board] button
Selecting the board
Select board data from list.
Selected board data
name is displayed.
64304-L3-00
2
Check the board data.
Check that the selected board data name is shown in the status area. Also check that the displayed
board size, mask size and squeegee type are correct.
Setup screen after selecting board data
Selected board name
Board size
Mask size
Squeegee type
64305-L3-00
3-5
3
Daily operation
4. Changing the conveyor unit setup
When producing boards that are different from the previous production board, you need to change the
conveyor unit setup to match the selected board. (This procedure is not necessary when you are producing
the same board as last time.)
c
CAUTION
When producing board whose width is narrower than the previous production board, remove in advance the matrix
pins (or board support jigs) from the push-up plate.
1
Open the [Unit]-[Conveyor] tab.
The buttons on this screen are used in the following steps to change the conveyor unit setup.
[Unit]-[Conveyor] tab
Step 3:
[Conv-MS Axis Position] button
Step 2:
[SW. Prod. Position] button
Step 6:
[Convey In] button
64306-L3-00
2
Press the [SW. Prod. Position] button.
The conveyor table rises to the same height as the conveyor rails and the squeegee head moves to the
position where the squeegee is attached and detached.
3
Adjust the conveyor width and main stopper position.
1. Press the [Conv-MS Axis Position] button.
The dialog box appears for changing the conveyor width and main stopper position.
2. Check the board width and length shown in the dialog box and press the [OK] button.
The conveyor width and main stopper position are automatically changed to match the board size.
Dialog box for changing conveyor width and main stopper position
64307-L3-00