JANETS_INM.pdf - 第127页

JaNets In structio n Manual 5. Shopflo or Setu p 5-7 Moving a floor assignment Figure 5.2 - 10 Moving a production line Bending a production line Figure 5.2 - 11 Bending a production line Figure 5.2 - 12 Overlapped produ…

100%1 / 755
JaNets Instruction Manual 5. Shopfloor Setup
5-6
Making assignment of a floor
Drag and drop a “production line” located under the “Unassigned” lines, or a floor to the floor view.
When a line is assigned to the floor, the corresponding “line” is moved from the floor configuration
tree to the destination “floor.”
Figure 5.2-6 Before making assignment of a
floor
Figure 5.2-7 After making assignment of a floor
Canceling a floor assignment
Select the “Unassigned lines” on the floor configuration tree, and drag them to the floor view.
When you drop them, they are moved under the “Unassigned” item on the floor configuration tree.
Your cancel of a floor assignment causes the machine icon to be deleted from the floor view.
Figure 5.2-8 Assigned production lines
Canceling a floor assignment
Figure 5.2-9 Assigned production lines
after the floor assignment is cancelled
Floor
configuration
tree
Floor view
Floor
configuration
tree
Floor view
Unassigned floor view
Floor configuration
tree
JaNets Instruction Manual 5. Shopfloor Setup
5-7
Moving a floor assignment
Figure 5.2-10 Moving a production line
Bending a production line
Figure 5.2-11 Bending a production line
Figure 5.2-12 Overlapped production lines
Drag and drop.
Floor view
When you click the desired machine with
the right button, the pop-up menu for
rotation appears on the screen. Select the
angle for bending the desired production
line.
The machine whose position is
overlapped with another one is
indicated with the bold red
frame.
JaNets Instruction Manual 5. Shopfloor Setup
5-8
Floor Configuration
Floor Configuration (Line)
When you assign a production line to the floor, the setting items for the assigned production line
are added to the list.
Figure 5.2-13 Floor details
Setting the background color of a production line
Figure 5.2-14 Production line view Before the
background color of a production line is changed
Figure 5.2-15 Production line view After the
background color of a production line is
changed
The background color changes.
Floor mapcontrol:
Displays the entire map of the floor
and the area cursor for displaying the floor view.
Production lines assigned to the floor
are displayed on this list.
Double-click the desired production line or press the Enter key. The
Set Colorsdialog box appears on the screen. Select the desired color.