JaNets Instr ucti on Man ual 13 . Program D ownloa der 13 - 26 13.9.9 Next produc tion program reservation After the pr oduction pro gr am to be down loaded n ext is reser ved and the up loading an d co mbinati on of the…

100%1 / 755
JaNets Instruction Manual 13. Program Downloader
13-25
If the system fails to notify any machine of the change of the planned number of PWBs to be
produced, the confirmation message appears on the screen as shown in Figure 13.9-14.
Figure 13.9-14 Failure message
13.9.8.3 Quitting the “Change of Planned No. of PWBs” screen
When you click the <Close> button, the message for confirming quit operation appears on the
screen.
If no machine changed the planned number of PWBs to be produced or if all machines changed
the respective numbers, the confirmation message appears on the screen as shown in Figure
13.9-15.
Figure 13.9-15 Confirmation message for quitting the screen
when the system succeeded in notifying the machine(s) of the change
If any machine fails to change the planned number of PWBs, the confirmation message appears
on the screen as shown in Figure 13.9-16.
Figure 13.9-16 Confirmation message for quitting the screen
when the system failed to notify the machine of the change
List of machines whose number of
PWBs to be produced the system failed
to change:
Machines whose number of PWBs
to be produced the system failed to
change are displayed here.
JaNets Instruction Manual 13. Program Downloader
13-26
13.9.9 Next production program reservation
After the production program to be downloaded next is reserved and the uploading and
combination of the current production program is completed, the reserved production program is
automatically downloaded.
<Precautions>
[1] The next production program can be reserved only for the line that is under production by
each production program. It cannot be reserved for a line in which production has been
completed or a line in which the reserved file is under production.
[2] The number of next production programs that can be reserved is 1. It is impossible to reserve
multiple programs for a single line as a next production program.
[3] After the next production program is downloaded to one of machines of the production line,
you cannot change the setting of the “Planned No. of PWBs” of the next production program.
[4] When you open another production program, reservation information of the next
production program is deleted.
[5] When the system starts reserving the next production program for the production line, it does
not download/upload any production program to the production line that is being reserved until
the reservation is completed or canceled. It loads/unloads a production program to any
production line other than the production line that is being reserved.
JaNets Instruction Manual 13. Program Downloader
13-27
13.9.9.1 Specifying a local file as the next production program
To reserve the next production product, select “File” “Next production program reservation” in the
menu. When the dialog box for opening a file appears on the screen, select a production program
for reserving PWB production, and then click the <Open> button.
Figure 13.9-17 Next production program reservation
13.9.9.2 Specifying a file stored in a server as the next production program
Follow the procedure described in Section 13.9.1.2 “Specifying a program registered in a server
to specify an optimized production file with the Program Explorer, and then drag and drop it to the
Line Monitor.
13.9.9.3 Specifying the number of PWBs to be produced of the next production program
Since the “Set Planned No. of PWBs” dialog box appears on the screen after you specify a
production program, specify the number of PWBs to be produced.
Figure 13.9-18 Number of PWBs to be produced of the next production program
With this, the reservation of the next production program is completed. The information of the
reserved production program and the number of PWBs to be produced are displayed on the
“Production status” panel.
Figure 13.9-19 Production status panel after the next production program is reserved