SG_FSE_SiplaceHF_HF3_00193901-05_eng.pdf - 第205页

1 - 5 S tudent Guide SIPLACE HF/HF3 Edition 09/2005 6 Colle ct &Place-Head / DLM2 5 Star station 1 6 Pick-up cycle The nozzle is lowered onto the component. Once the valve positioning unit h as opened the vac- uum ci…

100%1 / 596
1 - 4
Student Guide SIPLACE HF/HF3
6 Collect &Place-Head / DLM2 Edition 09/2005
4
6.1.2 Steps when picking up and placing components
A PCB moves into the placement area of the PCB conveyor.
After the fiducial measurement with both gantries for each placement area (with SW505), the
C&P head picks up components from the feeder moduls.
The components are measured below the component camera and turned in the Dp station into
the correct angle position.
In the star station 1 the component will be place.
6.1.3 Position and function of the individual star stations
Fig. 6.1 - 2 Overview of the functions of star stations 1 - 12 I-XII segment numbers
I-XIISegment numbering
Star station 1: pick up, place and reject component 6
Star station 2: no function 6
Star station 3: no function (at HF/HF3 machine) 6
Star station 4, 5 and 6: no function 6
Star station 7: optically center component 6
Star station 8: no function 6
Star station 9: rotate component 6
Star station 10: position for removing and inserting sleeves 6
Star stations 11 and 12: no function (optionally Component sensor between star station 11 & 12)6
optionally:
Component sensor
1 - 5
Student Guide SIPLACE HF/HF3
Edition 09/2005 6 Collect &Place-Head / DLM2
5
Star station 1 6
Pick-up cycle
The nozzle is lowered onto the component. Once the valve positioning unit has opened the vac-
uum circuit to the nozzle, the nozzle draws up the component and removes it from the feeder mod-
ule.
Placement cycle
The nozzle, together with the component, is lowered onto the PCB that has been moved into
place. The valve positioning unit closes the vacuum channel to the nozzle. A short burst of com-
pressed air detaches the component from the nozzle and places it on the PCB.
Reject cycle
After the gantry reach the X- and Y-reject position the valve positioning unit closes the vacuum
channel to the nozzle. Defective components are detached from the nozzle with a short burst of
compressed air and are discarded.
Star station 7 6
The component is optically centered. 6
Star station 9 6
Pick-up cycle 6
The nozzle is rotated to the pick-up position. 6
Placement cycle
The component is rotated to the placement position (angle of rotation).
Star station 10 6
The SW move nozzles and sleeves to here for checking. 6
between Star station 11&12 6
Option on 12 nozzle head:
The component height is optically checked before placement.
6
1 - 6
Student Guide SIPLACE HF/HF3
6 Collect &Place-Head / DLM2 Edition 09/2005
6
6.1.4 Overview parts on the 12 Segment C&P head
6
Fig. 6.1 - 3 DLM2 Collect&Place head - parts overview 1
Item Designation Item no.
1
Collect&place head SP12 complete / DLM2
Collect&place head SP6 complete / DLM2
00367281-02
00367020-01
2 Light barrier for "Z-axis up" 00347297-01
3
Valve positioning drive, placement circuit
Valve positioning drive, reject circuit
00368075-01
00367768-01
4 Toothed belt T2 / DLM2 00334936-01
5 Z-axis drive / DLM2 00341011-01
6
SP6_12 intermediate distribution board, digi-
tal (under the cover) 00330648-05