SG_FSE_SiplaceHF_HF3_00193901-05_eng.pdf - 第219页

1 - 19 S tudent Guide SIPLACE HF/HF3 Edition 09/2005 6 Colle ct &Place-Head / DLM2 19 6.2.7 Completion of the Z-axis Reference Run Fig. 6.2 - 7 Completion of the Z-axis reference run – T he S tar-axis turn s to 6250 …

100%1 / 596
1 - 18
Student Guide SIPLACE HF/HF3
6 Collect &Place-Head / DLM2 Edition 09/2005
18
6.2.5 Preparing Z-axis Reference Run
Fig. 6.2 - 5 Preparing Z-axis reference run (6 C&P head)
The Z-axis runs to uppermost end stop. When stand still is detected the Z-axis runs down by 27
digits with reduced force.
This Z-axis position with reduced force enables the placement star to move into reference posi-
tion.
6.2.6 Reference Run at Star-Axis
Fig. 6.2 - 6 Reference run at star-axis
The star-axis turns counter clockwise to zero point pulse of the incremental shaft encoder. The
zero point correction is loaded. The star-axis turns clockwise (according the zero point correction)
until the position counter shows 0 digit.
Segment number 1 is now in pick-up / placement position.
4
1
5
2
3
6
1 - 19
Student Guide SIPLACE HF/HF3
Edition 09/2005 6 Collect &Place-Head / DLM2
19
6.2.7 Completion of the Z-axis Reference Run
Fig. 6.2 - 7 Completion of the Z-axis reference run
The Star-axis turns to 6250 digit(HF)2500(HS/S/F). At this position the segment ball bearing is
exactly between Z-claw and circular guidance.
Z-axis moves to the upper end stop and takes the position. The same is done at the lower end
stop.
The average value of these results is calculated and with a negative sign is loaded for refer-
ence value (ZPC) to the axis controller.
Star-axis is moved back to reference position.
Z-axis starts the reference run again with this new value.
1 - 20
Student Guide SIPLACE HF/HF3
6 Collect &Place-Head / DLM2 Edition 09/2005
20
6.2.8 Reference Run at Dp-axis
The function of the DP axis is, to turn the nozzle in the correct pick up angle. After the component
recognition the DP-axis turn the components in correct placement angle.
Fig. 6.2 - 8 Reference run at DP-axis
The segment now in the DP-station is turned to reference position. (Segment 3 at 6 nozzle
head / Segment 5 at 12 nozzle head.)
Sequence: the DP-station swivels in. The axis starts and searches for the zero pulse. The Zero
pulse is checked on failure. The DP-station swivels out after the end signal.
The swiveling function is controlled by the CAN-Bus.
Turning the sleeve is controlled by the axis controller with signals from DP-position encoder.
The zero point correction on the DP-axis is always 0 (because up to 12 segments are operated
by one drive).
C&P Head Reference run finished!